Unit of competency Outline

Date retreived
22/07/2026 10:01 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Safely handle and use scaffolding tools and equipment

Safely handle and use scaffolding tools and equipment

Unit of competency
National Code
CPCCSC2001A
State Code
W9498
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
20/06/2014
Nominal Hours
32
Description
This unit of competency specifies the outcomes required to safely move, locate, inspect, service and store scaffolding together with associated tools and equipment, in order to assist project planning and ensure OHS requirements and manufacturer specifications are met.It includes delivering, selecting, positioning and maintaining scaffolding tools and equipment.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults or concerns regarding quality requirements are rectified or reported prior to commencement.
  • 1.5. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.6. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Handle, sort and stack scaffolding equipment and associated tools.
  • 2.1. Tools and equipment are safely and effectively used according to manufacturer recommendations and state or territory OHS requirements.
  • 2.2. Scaffolding equipment is moved to specified location, applying safe manual and mechanical handling techniques.
  • 2.3. Scaffolding equipment is sorted to suit material type and size, and stacked for ease of identification and retrieval for task sequence and job location in accordance with job specifications.
  • 2.4. Scaffolding equipment and associated tools are protected against physical, chemical, environmental and water damage and stored clear of access ways, for ease of identification, retrieval and distribution.
3. Prepare for mechanical handling of materials.
  • 3.1. Scaffolding equipment is stacked/banded for mechanical handling in accordance with the type of material and plant or equipment to be used.
  • 3.2. Scaffolding equipment is loaded, unloaded, moved or located at specified location assisting the forklift driver, rigger and dogman.
  • 3.3. Scaffolding equipment and tools are safely handled with mechanical lifting devices.
4. Clean up.
  • 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 4.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to handling and using scaffolding tools and equipment
relevant Australian standards
safe work procedures relating to handling and using scaffolding tools and equipment
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
planning and preparation includes work site inspection, equipment defect identification, assessment of conditions and hazards, and determination of work requirements
handling methods for scaffolding include manual handling; assisting the forklift driver, rigger and dogman; and basic mechanical lifting devices and gin wheels
mechanical lifting devices include pallet trolley, forklift, barrow hoist or teleporter
scaffolding equipment types include tubes, planks, sole boards, timber, metal, stairs, connectors and couplers, toe boards, bolts, frames, ledgers, transoms, bracing, clips and fittings, brick guards, standards, screw jacks, adjustable wheels, steel wire rope, fibre ropes, ladder beams, catch platforms, prefabricated toner scaffold, bracket scaffolds and ropes
stacking and storage are to include pallets, stillage and banding.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
hammers
ladders
nips
pallet trolleys
planks, including laminated
spanners
spirit levels
tape measures
may include:
cutters
forklifts
hammer drills
materials hoists
shovels
sledge hammers
wheelbarrows.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
safely handle scaffolding equipment and associated tools for all mandatory equipment and tools specified in the range statement, following OHS regulations.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1879 BCGSC2001B Safely handle and use scaffolding tools and equipment Unit of competency
Replaced By
State Code National Code Title Type
OCM74 CPCCSC2001 Handle and position scaffolding tools, equipment and components Unit of competency
State Code National Code Title Type
J785 CPC30413 Certificate III in Demolition Qualification
D398 CPC30911 Certificate III in Scaffolding Qualification
W585 CPC30908 Certificate III in Scaffolding Qualification