Unit of competency Outline
Date retreived
22/07/2026 8:17 PM AWST
22/07/2026 8:17 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct concrete boom delivery operations
Conduct concrete boom delivery operations
Unit of competency
National Code
CPCCCO3052A
CPCCCO3052A
State Code
WI737
WI737
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
20/06/2014
Nominal Hours
80
Description
This unit of competency specifies the outcomes required to conduct concrete boom delivery operations, using a vehicle-borne pumping system, in support of construction projects. It covers systems with a minimum of two boom stages.The unit covers planning and preparing for work; conducting operational checks; the safe and effective operation of the vehicle and pumping system; the safe establishment, use and monitoring of the boom distribution system; and conducting operator maintenance and work finalisation activities.The unit may include working with others and as a member of a team.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes.
- 1.2 Tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins.
- 1.3 Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.4 Environmental requirements are identified for the project according to environmental plans, local council requirements and regulatory obligations.
2 Conduct boom delivery system pre-operational checks.
- 2.1 Pre-start, start-up, park and shut-down procedures, including emergency shut-down procedures, are carried out on the vehicle and pump according to manufacturer and/or site-specific requirements.
- 2.2 Vehicle controls and functions are checked for serviceability and faults are rectified and reported in vehicle log book.
- 2.3 Distribution system components are checked before use.
- 2.4 Hoppers are cleaned and serviced prior to use.
3 Operate concrete boom delivery vehicle.
- 3.1 Hazards associated with vehicle positioning and operations are identified and safe operating techniques are used to minimise risk.
- 3.2 Engine power is managed to ensure efficiency of concrete pump vehicle platform movements and to minimise damage to engine and gears.
- 3.3 Engine power is coordinated with gear selection ensuring smooth transition and operation within torque range.
- 3.4 Truck is operated to work instructions according to company operating procedures.
- 3.5 Road and traffic conditions are monitored, taking into account road standards, traffic flow, distance and load, and ensuring no injury to people or damage to property, equipment, loads and facilities.
- 3.6 Truck is brought to a halt smoothly, using the engine retarder, gears and brakes, and minimising wear and tear on vehicle.
4 Deliver concrete.
- 4.1 Hazards associated with positioning and operating boom delivery components are identified and analysed, and safe operating techniques are used to minimise risk.
- 4.2 Boom delivery vehicle is positioned at site where it can best service the delivery task and provide access to concrete supply vehicles.
- 4.3 Delivery platform stabilisers are prepared, deployed and checked to manufacturer requirements for operation and safety.
- 4.4 Delivery system components are positioned securely and safely, according to manufacturer specifications, and checked prior to use.
- 4.5 Pumping systems are test run and prepared for use according to equipment specifications.
- 4.6 Supply of bulk concrete mix to the hopper is coordinated safely with supply vehicle operators.
- 4.7 Boom delivery system is operated and its positioning is varied to maintain concrete delivery to the required destination.
- 4.8 Boom delivery system is safely withdrawn at completion of delivery task.
5 Carry out operator maintenance.
- 5.1 Boom delivery vehicle is safely parked, prepared for maintenance and shut down as per manufacturer manual and organisational requirements.
- 5.2 Inspection and fault finding on the vehicle, pump and boom system components are conducted according to manufacturer specifications, with outcomes recorded according to workplace procedures.
- 5.3 Defective parts are removed and replaced safely and effectively according to manufacturer manual and organisational requirements.
- 5.4 Regular programmed maintenance tasks are carried out according to manufacturer and organisational requirements.
6 Clean up.
- 6.1 Work area is cleared and materials disposed of, reused or recycled according to project environmental management plan.
- 6.2 Vehicle, tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
diagrams or sketches
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to concrete boom delivery
relevant Australian standards
safe work procedures relating to concrete boom delivery
safety data sheets
signage
vehicle systems operations and the environment
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Environmental requirements may include:
designation of a pump washout area
clean-up management
dust suppression, noise and fume abatement
stormwater management
vibration management
waste management.
Functions must include:
brakes
manoeuverability
steering.
System components must include:
adaptors
boom components
hoses
lines.
Hazards associated with vehicle positioning and operations mayinclude:
interruption of concrete flow
mechanical failure of vehicle or parts
positioning hazards:
insufficient clearance space between trucks and equipment
placing vehicle and pump on sloping or unstable ground
proximity of vehicle to trenches
traffic-related hazards.
Hazards associated with positioning and operating boom mayinclude:
mechanical failure of the boom
proximity to overhead power lines or electrical equipment
traffic-related hazards.
Concrete delivery systems:
must include:
boom-mounted conveyors
lines
may include adaptors.
Concrete mixes vary in water content and, in order from wet to dry, include:
block-fill
pool-mix
topping
slab
footing
curb and guttering.
Operator maintenance:
must include:
authorised servicing
cleaning
monitoring, recording and reporting faults
may include:
conducting authorised minor replacements
providing assistance to maintenance personnel during maintenance and repair activities.
Work health and safety requirements must comply with state and territory legislation and regulations and project safety plan, and may include:
assistance of others or the use of manual or mechanical lifting devices with handling activities where size, weight or other issues, such as disability, are a factor
emergency procedures, including extinguishing fires, organisational first aid requirements, and evacuation procedures
hazard control
hazardous materials and substances
personal protective equipment (PPE) prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
signage and restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working outdoors in warm climates
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Information may include:
diagrams or sketches
instructions issued by authorised organisational and external personnel
memos
regulatory and legislative requirements relating to concrete boom delivery
relevant Australian standards
safe work procedures relating to concrete boom delivery
safety data sheets
signage
vehicle systems operations and the environment
verbal, written and graphical instructions, including manufacturer specifications and instructions where specified
work bulletins
work schedules, plans and specifications.
Planning and preparation must include:
assessing conditions and hazards
determining work requirements and safety plans and procedures
identifying and rectifying equipment defects
inspecting work sites.
Environmental requirements may include:
designation of a pump washout area
clean-up management
dust suppression, noise and fume abatement
stormwater management
vibration management
waste management.
Functions must include:
brakes
manoeuverability
steering.
System components must include:
adaptors
boom components
hoses
lines.
Hazards associated with vehicle positioning and operations mayinclude:
interruption of concrete flow
mechanical failure of vehicle or parts
positioning hazards:
insufficient clearance space between trucks and equipment
placing vehicle and pump on sloping or unstable ground
proximity of vehicle to trenches
traffic-related hazards.
Hazards associated with positioning and operating boom mayinclude:
mechanical failure of the boom
proximity to overhead power lines or electrical equipment
traffic-related hazards.
Concrete delivery systems:
must include:
boom-mounted conveyors
lines
may include adaptors.
Concrete mixes vary in water content and, in order from wet to dry, include:
block-fill
pool-mix
topping
slab
footing
curb and guttering.
Operator maintenance:
must include:
authorised servicing
cleaning
monitoring, recording and reporting faults
may include:
conducting authorised minor replacements
providing assistance to maintenance personnel during maintenance and repair activities.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
conduct concrete boom delivery truck system operations over not less than three shifts at two different sites, which will include demonstration of:
positioning of the vehicle
preparation and positioning of the booms and lines
preparation of the pump and hopper
coordination of maintenance of hopper levels
delivery of concrete to required location on work site
variation of boom delivery system positioning to meet changing requirements
withdrawal of the boom delivery system
application of emergency procedures
authorised operator maintenance
locate, interpret and apply relevant information, standards and specifications relating to concrete boom delivery operations
comply with site safety plans and procedures
comply with organisational policies and procedures, relating to concrete boom delivery operations, including quality requirements
communicate and work effectively and safely with others during each stage of the concrete boom delivery operation.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Overview of assessment
This unit of competency could be assessed by undertaking a range of tasks in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person should demonstrate the ability to:
conduct concrete boom delivery truck system operations over not less than three shifts at two different sites, which will include demonstration of:
positioning of the vehicle
preparation and positioning of the booms and lines
preparation of the pump and hopper
coordination of maintenance of hopper levels
delivery of concrete to required location on work site
variation of boom delivery system positioning to meet changing requirements
withdrawal of the boom delivery system
application of emergency procedures
authorised operator maintenance
locate, interpret and apply relevant information, standards and specifications relating to concrete boom delivery operations
comply with site safety plans and procedures
comply with organisational policies and procedures, relating to concrete boom delivery operations, including quality requirements
communicate and work effectively and safely with others during each stage of the concrete boom delivery operation.
Context of and specific resources for assessment
Assessment of this unit:
must be in the context of the work environment
may be conducted in an off-site context, provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills
must meet relevant compliance requirements.
Resource implications for assessment include:
an induction procedure
realistic tasks or simulated tasks covering the mandatory task requirements
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
safety data sheets.
Method of assessment
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
direct observation of tasks in real or simulated work conditions
questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
review of relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7370 | CPCCCO3032A | Conduct concrete boom delivery operations | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAP13 | CPCCCO3052 | Conduct concrete boom delivery operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J784 | CPC30313 | Certificate III in Concreting | Qualification |