Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Set out conservation earthworks
Set out conservation earthworks
Unit of competency
National Code
AHCSAW401
AHCSAW401
State Code
BAS42
BAS42
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/01/2017
Field of Education
040399 - Building, N.e.c.
Original Release Date
12/01/2017
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to set out standard structures using specialised pegging and marking techniques, for erosion and sediment control earthworks.This unit applies to individuals who take responsibility for their own work and use discretion and judgement in the selection, allocation and use of available resources. This includes undertaking a range of routine and non-routine activities and work in known and changing contexts.No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Interpret plans and specifications
- 1.1 Determine overall plan in consultation with landholder and surveyor
- 1.2 Establish earthworks specifications in consideration of desired outcome and prevailing conditions
- 1.3 Verify plan in line with job requirements
2. Relate plan to site
- 2.1 Locate key plan points on site
- 2.2 Identify additional features on site plan
- 2.3 Identify and record site issues which affect survey and pegging
3. Peg project
- 3.1 Establish pegging sequence in consultation with the site surveyor
- 3.2 Measure site dimensions in compliance with job specification
- 3.3 Establish peg locations using prescribed methods
- 3.4 Peg earthworks in line with project specification
- 3.5 Advise all construction personnel of pegging and the need for site integrity
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D7237 | AHCSAW401A | Set out conservation earthworks | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCT23 | AHCSAW402 | Set out conservation earthworks | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BCZ9 | AHC40916 | Certificate IV in Conservation and Land Management | Qualification |
| BDA9 | AHC42116 | Certificate IV in Permaculture | Qualification |