Unit of competency Outline

Date retreived
22/07/2026 7:09 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design and supervise complex environmental field surveys

Design and supervise complex environmental field surveys

Unit of competency
National Code
MSL975042
State Code
OAC19
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/07/2018
State Implementation and Classification
Approved Date
29/11/2018
Field of Education
039901 - Environmental Engineering
Original Release Date
29/11/2018
Nominal Hours
120
Description
This unit of competency describes the skills and knowledge to design and supervise complex field surveys for a wide range of environmental systems. This unit covers confirming survey requirements, designing and organising field surveys to achieve their purpose, and supervising the field survey according to a defined plan. This unit applies to technical officers working in the environmental industry sector. All operations must comply with relevant standards, appropriate procedures and/or workplace requirements.No licensing or certification requirements exist at the time of publication. However, regulations and/or external accreditation requirements for laboratory operations exist, so local requirements should be checked. Relevant legislation, industry standards and codes of practice within Australia must also be applied.
Notes
Elements and Performance Criteria
1 Confirm survey requirements with senior staff
  • 1.1 Confirm the purpose and objectives of the field survey activities with senior management and details of information required
  • 1.2 Clarify the purpose and objectives of the field survey activities with all stakeholders within the context of the workplace's overall environmental program
  • 1.3 Identify and accurately interpret all external statutory requirements and workplace protocols that relate to the defined field survey activities
  • 1.4 Analyse drivers and constraints that may influence field survey activities
  • 1.5 Document the type, quantity and quality of data needed to meet the defined objectives
  • 1.6 Refine and document the detailed objectives of the field activities with senior management and stakeholders
2 Design field survey activities
  • 2.1 Develop and document details of the field survey methodology
  • 2.2 Discuss and confirm survey methodology with senior staff and external experts or stakeholders
  • 2.3 Develop work program, including timetable and staff roles and responsibilities for the total field survey, and all related activities
  • 2.4 Ensure that work program conforms to workplace requirements covering risk management, data quality procedures, safety, environmental and emergency requirements
  • 2.5 Document work program
  • 2.6 Address all administration requirements and obtain appropriate approvals
3 Identify resources and supervise pre-survey checks
  • 3.1 Identify and list all resources required to implement the agreed work program
  • 3.2 Arrange collection and checking of all equipment, field instruments and supplies required for implementation of the work program
  • 3.3 Supervise calibration of all appropriate field instruments
  • 3.4 Arrange correct packaging and transportation of equipment and instruments
  • 3.5 Arrange suitable access, transport, communication and emergency systems for all field locations and activities
4 Supervise field survey activities
  • 4.1 Supervise all field survey and associated activities
  • 4.2 Monitor equitable duty rosters covering field survey activities in consultation with all staff
  • 4.3 Follow data quality procedures
  • 4.4 Perform survey work safely and with minimal impact on the environment
5 Supervise close-down of field activities
  • 5.1 Arrange for the checking, packaging and transportation of all samples, equipment and instruments back to base
  • 5.2 Ensure that site is left in accordance with workplace and environmental requirements
  • 5.3 Monitor dispatch of collected samples for subsequent laboratory analyses
  • 5.4 Test and document all equipment and instruments before final storage, as required
  • 5.5 Store all field data appropriately for subsequent analysis
  • 5.6 Report results, any anomalies and recommendations to data analysers, users and/or supervisor
No information
No information
Replaces
State Code National Code Title Type
AWN85 MSL975011 Design and supervise complex environmental field surveys Unit of competency