Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Manage repairs and maintenance of a vessel 500 gross tonnage or more
Manage repairs and maintenance of a vessel 500 gross tonnage or more
Unit of competency
National Code
MARB6001A
MARB6001A
State Code
WG377
WG377
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
10/02/2014
Field of Education
031701 - Maritime Engineering
Original Release Date
10/02/2014
Nominal Hours
66
Description
This unit involves the skills and knowledge required to implement a vessel planned maintenance system to ensure effective maintenance of a vessel 500 gross tonnage or more to ensure its seaworthiness.
Notes
Elements and Performance Criteria
1 Define maintenance targets
- 1.1 Compliance documentation relevant to the maintenance of the vessel is interpreted
- 1.2 Vessel planned maintenance system is interpreted to establish maintenance activities and priorities according to regulatory and organisational requirements
- 1.3 Current maintenance practices are reviewed to evaluate efficiency, reliability and comparative cost effectiveness
- 1.4 Maintenance targets are set to ensure compliance and cost effectiveness
2 Optimise maintenance management
- 2.1 Objectives of maintenance are clearly defined and appropriate maintenance mechanisms are determined
- 2.2 Preventative maintenance activities are forecast, scheduled and matched to resources to ensure work is done on time and within cost
- 2.3 Optimal cost balance between preventative and corrective maintenance activities is determined
- 2.4 Priority system for preventative and corrective maintenance is developed based on critical analysis to maximise quality outcomes
- 2.5 Maintenance plan is negotiated and agreed in consultation with relevant stakeholders
- 2.6 Monitoring and reporting arrangements for maintenance activities are established and documented according to organisational procedures
- 2.7 Risk management plan to identify, assess and control risks is incorporated into maintenance plan according to regulatory and organisational requirements
3 Organise support processes
- 3.1 Resource requirements are determined and organised according to the maintenance plan
- 3.2 Targets and milestones are identified and linked to the achievement of outcomes according to the maintenance plan
- 3.3 Documentation and checklists associated with the implementation of the maintenance plan are prepared in established formats and distributed to relevant people
- 3.4 Information related to the implementation of the maintenance plan is distributed according to organisational procedures
- 3.5 Contingency arrangements for the implementation of the maintenance plan are identified
4 Monitor implementation of maintenance plan
- 4.1 Progress is systematically monitored and variations to implementation of the maintenance plan are verified as required with relevant people
- 4.2 Expenditure and resource usage are monitored and controlled to ensure objectives are achieved within specified parameters
- 4.3 Coaching and mentoring assistance is provided to crew members as required to overcome difficulties in implementing the plan
- 4.4 Systems, records and reporting procedures are maintained according to regulatory and organisational requirements
5 Evaluate implementation of maintenance plan
- 5.1 Regular reports on progress and outcomes are provided to relevant stakeholders to ensure completion of activities is in line with maintenance plan
- 5.2 Systematic review processes and established evaluation methods are used to evaluate implementation processes and outcomes
- 5.3 Evaluation results are prepared in required format and presented to relevant people within agreed timeframes
- 5.4 Recommendations for improving implementation processes are presented to relevant people according to organisational procedures
- 5.5 Relevant documentation is completed and processed according to regulatory and organisational requirements
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below.
Compliance documentation may include:
Cargo gear and equipment register
Maintenance schedules and records according to the planned maintenance system
Port state control inspection records
Statutory survey certificates
Statutory survey periodic inspection records
Vessel general arrangement plans, docking plan and manuals relevant to maintenance requirements
Vessel planned maintenance system may include:
Adequate back-up, either back-up copy on board or a regular exchange of data between ship and office for computerised systems
Documents specifying maintenance jobs carried out and their results
Equipment manufacturer requirements as part of planned maintenance program
Following maintenance procedures
Performance results and measurements taken at certain intervals for trend investigations from delivery stage
Procedures required for docking preparation, including repair lists and survey requirements
Signing instructions to indicate who is responsible for verification of maintenance work carried out
Time intervals at which the maintenance jobs are to take place
Writing description and documentation of planned maintenance system in English
Preventative maintenance activities may include:
Applying lubricants to moving parts
Hull cleaning and painting
Identifying deterioration of vessel structure and fittings, including cargo spaces, fresh water and ballast tanks
Inspecting and repairing or replacing cargo handling equipment including wires, blocks, shackles, chains and hooks
Prescribed tank inspections
Restoring weathered and rusted surfaces
Routine maintenance inspections
Corrective maintenance activities may include:
Damage repairs and control measures
Replacing defective parts
Maintenance plan may include:
Budgets and timetables that enable the commitment of resources at appropriate points
Consultative processes to involve stakeholders
Contingency plans to cater for changes or significant difficulties
Damage control plans
Environment plans
Life cycle management plans
Long-term capital and maintenance financial forecast
Maintenance standards
Objectives, scope and expected benefits of plan
Quality assurance procedures
Risk management processes
Specifications
Vessel and machinery and equipment maintenance, cleaning and lifesaving appliances maintenance
Relevant stakeholders may include:
Crew members
Engineers
Management
Subcontractors
Technical experts
Work health and safety (WHS)/occupational health and safety (OHS) representatives
Resource requirements may include:
Contractors
Crew members
Equipment
Materials
Specialist advice
Technicians
Training
Targets and milestones may include:
Agreed reporting requirements
Completing key tasks and maintenance phases
Measurement and achievement of set outcomes
Progress reports
Documentation may include:
Budgets and operating costs
Legal documentation
Service and maintenance records
Contingency arrangements may include:
Budgetary constraints
Competing work demands of contractors
Environmental factors, such as time and weather
Equipment and technology breakdown
Industrial disputes
Non-availability of resources and materials
Unforeseen incidents
Workplace hazards, risks and controls
Evaluation methods may include:
Checklists
Cost data analysis
Interviews
Observation
Review of quality assurance data
Review of safety and planned maintenance systems
Compliance documentation may include:
Cargo gear and equipment register
Maintenance schedules and records according to the planned maintenance system
Port state control inspection records
Statutory survey certificates
Statutory survey periodic inspection records
Vessel general arrangement plans, docking plan and manuals relevant to maintenance requirements
Vessel planned maintenance system may include:
Adequate back-up, either back-up copy on board or a regular exchange of data between ship and office for computerised systems
Documents specifying maintenance jobs carried out and their results
Equipment manufacturer requirements as part of planned maintenance program
Following maintenance procedures
Performance results and measurements taken at certain intervals for trend investigations from delivery stage
Procedures required for docking preparation, including repair lists and survey requirements
Signing instructions to indicate who is responsible for verification of maintenance work carried out
Time intervals at which the maintenance jobs are to take place
Writing description and documentation of planned maintenance system in English
Preventative maintenance activities may include:
Applying lubricants to moving parts
Hull cleaning and painting
Identifying deterioration of vessel structure and fittings, including cargo spaces, fresh water and ballast tanks
Inspecting and repairing or replacing cargo handling equipment including wires, blocks, shackles, chains and hooks
Prescribed tank inspections
Restoring weathered and rusted surfaces
Routine maintenance inspections
Corrective maintenance activities may include:
Damage repairs and control measures
Replacing defective parts
Maintenance plan may include:
Budgets and timetables that enable the commitment of resources at appropriate points
Consultative processes to involve stakeholders
Contingency plans to cater for changes or significant difficulties
Damage control plans
Environment plans
Life cycle management plans
Long-term capital and maintenance financial forecast
Maintenance standards
Objectives, scope and expected benefits of plan
Quality assurance procedures
Risk management processes
Specifications
Vessel and machinery and equipment maintenance, cleaning and lifesaving appliances maintenance
Relevant stakeholders may include:
Crew members
Engineers
Management
Subcontractors
Technical experts
Work health and safety (WHS)/occupational health and safety (OHS) representatives
Resource requirements may include:
Contractors
Crew members
Equipment
Materials
Specialist advice
Technicians
Training
Targets and milestones may include:
Agreed reporting requirements
Completing key tasks and maintenance phases
Measurement and achievement of set outcomes
Progress reports
Documentation may include:
Budgets and operating costs
Legal documentation
Service and maintenance records
Contingency arrangements may include:
Budgetary constraints
Competing work demands of contractors
Environmental factors, such as time and weather
Equipment and technology breakdown
Industrial disputes
Non-availability of resources and materials
Unforeseen incidents
Workplace hazards, risks and controls
Evaluation methods may include:
Checklists
Cost data analysis
Interviews
Observation
Review of quality assurance data
Review of safety and planned maintenance systems
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, the required skills and knowledge, the range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the Elements, Performance Criteria, Required Skills, Required Knowledge and include:
preparing a detailed vessel maintenance plan that incorporates strategies addressing risk management, resource needs, monitoring and reporting arrangements, and quality assurance controls
attention to detail when completing documentation
providing high quality reports
ensuring currency of relevant legislative and regulatory knowledge.
Context of and specific resources for assessment
Performance is demonstrated consistently over time and in a suitable range of contexts.
Resources for assessment include access to:
industry-approved marine operations site where managing repairs and maintenance of a vessel of 500 gross tonnage or more may be conducted
tools, equipment and personal protective equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities
range of relevant exercises, case studies and/or other simulated practical and knowledge assessments
appropriate range of relevant operational situations in the workplace.
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals.
Method of assessment
Practical assessment must occur in an:
appropriately simulated workplace environment and/or
appropriate range of situations in the workplace.
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate to this unit:
direct observation of the candidate managing repairs and maintenance of a vessel of 500 gross tonnage or more
direct observation of the candidate applying relevant WHS/OHS requirements and work practices.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
In all cases where practical assessment is used it should be combined with targeted questioning to assess Required Knowledge.
Assessment processes and techniques must be appropriate to the language and literacy requirements of the work being performed and the capacity of the candidate.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the Elements, Performance Criteria, Required Skills, Required Knowledge and include:
preparing a detailed vessel maintenance plan that incorporates strategies addressing risk management, resource needs, monitoring and reporting arrangements, and quality assurance controls
attention to detail when completing documentation
providing high quality reports
ensuring currency of relevant legislative and regulatory knowledge.
Context of and specific resources for assessment
Performance is demonstrated consistently over time and in a suitable range of contexts.
Resources for assessment include access to:
industry-approved marine operations site where managing repairs and maintenance of a vessel of 500 gross tonnage or more may be conducted
tools, equipment and personal protective equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities
range of relevant exercises, case studies and/or other simulated practical and knowledge assessments
appropriate range of relevant operational situations in the workplace.
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals.
Method of assessment
Practical assessment must occur in an:
appropriately simulated workplace environment and/or
appropriate range of situations in the workplace.
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate to this unit:
direct observation of the candidate managing repairs and maintenance of a vessel of 500 gross tonnage or more
direct observation of the candidate applying relevant WHS/OHS requirements and work practices.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended.
In all cases where practical assessment is used it should be combined with targeted questioning to assess Required Knowledge.
Assessment processes and techniques must be appropriate to the language and literacy requirements of the work being performed and the capacity of the candidate.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| S5368 | TDMMB4307A | MONITOR AND MANAGE THE SEAWORTHINESS OF THE VESSEL | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AVE04 | MARB020 | Manage repairs and maintenance of a vessel 500 gross tonnage or more | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J568 | MAR60213 | Advanced Diploma of Maritime Operations (Master Unlimited) | Qualification |