Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform current injection testing using phantom load

Perform current injection testing using phantom load

Unit of competency
National Code
UETTDRTS37
State Code
OBG40
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/09/2019
State Implementation and Classification
Approved Date
04/12/2019
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
04/12/2019
Nominal Hours
36
Description
This unit covers the performance of current injecting testing using a phantom load. It includes the application of artificial load onto low voltage (LV) current transformers to determine correct meter function while ensuring testing is conducted in accordance with established procedures.It also includes the validation of secondary wiring circuits to determine the correct operation of the metering scheme.The application of the skills and knowledge described in this unit requires a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Plan for the performance of current injection testing using phantom load
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the performance of current injection testing using phantom load, are reviewed and determined
  • 1.2 Purpose of the performance of current injection testing using phantom load is established after data is analysed and expected outcomes of the work are confirmed with appropriate personnel
  • 1.3 Organisational established procedures, policies and specifications for the performance of current injection testing using phantom load are obtained or established with appropriate personnel
  • 1.4 Performance of current injection testing using phantom load procedures are discussed with/directed to appropriate personnel in order to ascertain the project brief
  • 1.5 Current injecting testing parameters are established from organisational established procedures, policies and specifications
  • 1.6 Equipment/tools and personal protective equipment (PPE) are selected based on specified performance criteria and established procedures
  • 1.7 Work roles and tasks are allocated according to requirements and individual competencies
  • 1.8 Work is prioritised and sequenced for the most efficient/effective outcome, completed within an acceptable timeframe to a quality standard and in accordance with established procedures
  • 1.9 Liaison and communication issues with others/authorised personnel, authorities, clients and customers are resolved and activities coordinated to carry out work
  • 1.10 Risk control measures are identified, prioritised and evaluated against the work schedule
  • 1.11 Relevant internal/external work permits are obtained to coordinate the performance of work according to requirements and/or established procedures
2 Carry out the performance of current injection testing using phantom load
  • 2.1 WHS/OHS and sustainable energy principles, functionality and practices to prevent the incidents of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures
  • 2.2 Decisions with regard to performance of current injection testing using phantom load are made on the basis of safety and effective outcomes according to requirements and/or established procedures
  • 2.3 Mathematical/engineering models for the application of current injection testing using phantom load are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures
  • 2.4 Technical advice is given regarding potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures
  • 2.5 Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements
  • 2.6 Application of current injection testing using phantom load is undertaken according to requirements and established procedures
  • 2.7 Solutions to non-routine problems are identified and actioned, using essential knowledge and associated skills, according to requirements
  • 2.8 Quality of work is monitored against personal performance agreement and/or established organisational and professional standards
3 Complete the performance of current injection testing using phantom load
  • 3.1 Final inspections of the low voltage (LV) current transformers are undertaken to ensure they comply with all requirements and include all specifications and documents needed to complete the project
  • 3.2 Appropriate internal/external personnel are notified of completion and reports and/or completion documents are finalised/commissioned according to established procedures and timeframes
  • 3.3 Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval
  • 3.4 Approved copies of the application of current injection testing using phantom load documents are issued and records are updated in accordance with established procedures
No information
No information
Replaces
State Code National Code Title Type
WD800 UETTDRTS37A Perform current injection testing using phantom load Unit of competency
Replaced By
State Code National Code Title Type
ODN95 UETDRTS022 Perform current injection testing using phantom load Unit of competency
State Code National Code Title Type
BEV3 UET40619 Certificate IV in ESI - Power Systems Network Infrastructure Qualification