Unit of competency Outline
Information current as of
20/10/2026 7:32 PM AWST
20/10/2026 7:32 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Maintain vehicle plant, tools, equipment and systems
Maintain vehicle plant, tools, equipment and systems
Unit of competency
National Code
AUMATK008
AUMATK008
State Code
WH916
WH916
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
11/03/2014
Original Release Date
10/01/2014
Nominal Hours
40
Field of Education
030717 - Plant And Machine Operations
Description
This unit describes the performance outcomes required to maintain and service plant, tools, equipment and systems required for the design, development and production of motor vehicles.It applies to those in an automotive manufacturing environment.No licensing, legislative or certification requirements apply to this unit at the time of publication.
General notes
N/A
Elements and Performance Criteria
1. Develop maintenance plans
- 1.1 Workplace procedures for maintaining plant, tools, equipment and systems are confirmed
- 1.2 Plant, tools, equipment or system to be maintained is identified
- 1.3 Instructions, plans and workplace checklists are identified
- 1.4 Preventative maintenance requirements are identified from manufacturer recommendations
- 1.5 Preventative maintenance work plan and schedules are prepared and submitted to appropriate personnel
2. Conduct maintenance
- 2.1 Preventative maintenance is conducted according to work plans and procedures and plant, tool, equipment or system is inspected for wear, defects and damage
- 2.2 Maintenance requirements are reported and recommendations made to appropriate personnel
- 2.3 Maintenance activities are conducted and results documented
3. Monitor performance post-maintenance
- 3.1 Critical performance measures and observations of plant, tool, equipment or system are obtained and recorded
- 3.2 Recorded performance measures and observations are compared against specifications and reported according to workplace procedures
4. Conduct adjustments and service
- 4.1 Checks and adjustments are made as required
- 4.2 Lubrication and regular servicing are carried out according to workplace procedures and manufacturer specifications
- 4.3 Adjustments and servicing procedures are documented
5. Document outcomes
- 5.1 Routine adjustments, and emergency and preventative maintenance activities are documented
- 5.2 Defective or malfunctioning plant, tools, equipment and system are reported according to workplace procedures
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| J831 | AUM40113 | Certificate IV in Automotive Manufacturing | Qualification |