Unit of competency Outline

Date retreived
22/07/2026 10:45 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Rehabilitate exploration site

Rehabilitate exploration site

Unit of competency
National Code
RIICAR301D
State Code
WH035
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
050999 - Environmental Studies, N.e.c.
Original Release Date
29/05/2014
Nominal Hours
50
Description
This unit describes a participant’s skills and knowledge required to rehabilitate exploration sites in Drilling and Metalliferous mining.This unit it appropriate for those in operational or technical specialist rolesNo licensing, legislation or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for site rehabilitation
  • 1.1 Access, interpret and apply exploration site rehabilitation documentation and ensure the work activity is compliant
  • 1.2 Access, read, interpret and apply the rehabilitation plan and Environmental Work Procedures (EWP)
  • 1.3 Identify, address and report potential hazards and risks
  • 1.4 Select and wear personal protective equipment appropriate for the work activity
  • 1.5 Obtain map of area and identify location of sites to be rehabilitated
  • 1.6 Establish communication system and protocols
  • 1.7 Carry out rehabilitation plant and equipment pre-start checks
2. Rehabilitate exploration site
  • 2.1 Assess and address hydrocarbon spills at drill site
  • 2.2 Ensure saline or contaminated water sumps are completely dry
  • 2.3 Identify and address waste materials according to rehabilitation plan and Environmental Work Procedures (EWP)
  • 2.4 Operate plant and machinery to scarify all cleared areas
  • 2.5 Retrieve cleared vegetation and return to rehabilitated site
  • 2.6 Remove and dispose of all rubbish
  • 2.7 Re-vegetate area, if required
  • 2.8 Record rehabilitation details
  • 2.9 Inspect rehabilitated site for compliance
3. Cap drill holes
  • 3.1 Excavate hole collar to suitable depth
  • 3.2 Pour excess drill chips into drill hole
  • 3.3 Select and insert hole plug firmly into hole opening/collar, and ensure water ingress and future erosion is prevented
  • 3.4 Backfill excavated soil onto plug and compact firmly, allowing for subsidence and run off
  • 3.5 Peg hole site and mark with ID number
4. Rehabilitate access tracks
  • 4.1 Remove all windrows
  • 4.2 Scarify tracks
  • 4.3 Retrieve cleared vegetation and restore to access track
  • 4.4 Block or disguise the entrance to the track