Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan and design water supply and disposal systems
Plan and design water supply and disposal systems
Unit of competency
National Code
SFIAQU507
SFIAQU507
State Code
OAS14
OAS14
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
21/10/2019
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
21/10/2019
Nominal Hours
50
Description
This unit of competency describes the skills and knowledge required to plan and determine the design and hydraulic requirements for water supply and disposal systems. It includes the ability to allocate pumps and infrastructure, design distribution, storage and treatment systems, and manage budgets and operational procedures. This unit applies to individuals who have specialised knowledge and technical and management responsibilities for planning and designing water supply and disposal systems for aquaculture workplaces.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Determine design requirements
- 1.1 Establish water budget based on identifying water sources that ensure water is available in sufficient quantities at all times
- 1.2 Determine water and soil quality to ensure appropriate environment is provided for stock
- 1.3 Design water transfer, recharge, reuse and treatment systems to conserve natural resources and match requirements for stock
- 1.4 Position culture or holding structures and systems to make the best use of water resources
- 1.5 Match water requirements with workplace production forecasts, expansion plans and seasonal variation
- 1.6 Ensure collection and storage processes do not degrade the water quality for the workplace or the environment
- 1.7 Document design calculations and decisions according to workplace requirements, ensuring construction specifications define the work required to provide suitable water for workplace
- 1.8 Identify environmentally sensitive areas and land degradation issues according to legislative requirements
- 1.9 Determine allowable effluent standards from relevant authority
2. Define pumping and power systems
- 2.1 Select pumps to deliver water efficiently from the water source or storage according to expert information or advice
- 2.2 Ensure pump motor combinations are efficient, reliable, functional, serviceable and flexible for the intended application
- 2.3 Optimise relationship between capital and operational costs and compare energy sources
- 2.4 Select accessories and performance indicators and integrate into functional systems that can be monitored and maintained
- 2.5 Document design calculations and decisions
- 2.6 Define work required in construction specifications to make suitable pumping and power systems available to workplace
- 2.7 Check power supply design specification with power authorities
- 2.8 Identify and minimise risks associated with power configurations, personal safety, water pressures and loads through system design and appropriate operating procedures
3. Design a distribution system
- 3.1 Commission detailed topographic survey or an accurate map showing extent, pond tank layout, physical constraints and contours with suitable interval
- 3.2 Develop excavation and earth moving plan, identifying internal or outside personnel, labour and machinery
- 3.3 Determine water budgets according to evaporation and seepage characteristics and water usage practices
- 3.4 Evaluate distribution systems and design according to system efficiencies, biosecurity and maintenance
- 3.5 Size pipes, valves and fittings according to design system specifications
- 3.6 Calculate achievable flows, water levels and pressures for the pumps
- 3.7 Include mechanisms for controlling and adjusting pressure, and isolation valves to direct water to areas with different water flow schedules
- 3.8 Design channel systems and attendant structures according to system requirements and calculation of channel flow velocities
- 3.9 Compare soil types for erodibility to select suitable fill for construction
- 3.10 Define construction plans and specifications to achieve the desired standards of uniformity and efficiency of water application
4. Design a drainage, storage and treatment system
- 4.1 Investigate regional geology and geography to predict sustainability of pond construction and water storage
- 4.2 Use site investigations to determine depth of clay, depth of ground water, soil and water salinity and structural or chemical impediments and calculations
- 4.3 Use costings to determine the most cost-effective storage system
- 4.4 Develop designs in conjunction with contractors and authorities
- 4.5 Design drains and structures capable of carrying planned water volumes and flow intensities
- 4.6 Incorporate waste water treatment structures according to design specifications
5. Determine capital expense budget
- 5.1 Document design calculations and decisions and communicate relevant information clearly through plans, specifications and manuals
- 5.2 Organise a competent designer to check design output against workplace objectives
- 5.3 Determine material requirements and document from plans and specifications
- 5.4 Estimate labour requirements based upon documented work schedule with reasonable allowance for variances in work schedules
- 5.5 Attribute costing to each component based upon quoted information from suppliers or sound analysis of individual elements
6. Establish management procedures
- 6.1 Confirm operating expense budget is applied to the completed water supply and disposal system
- 6.2 Develop contingency plans in the event of reduced water quality or quantity
- 6.3 Develop procedures for handling notifications from authorities pertaining to water supply and disposal
- 6.4 Involve the business in an integrated regional approach to water monitoring, quality and quantity supply issues and future planning
- 6.5 Research mechanisation or automation of process or activity, including the use of specialised contract services, and introduce as required
- 6.6 Establish record keeping procedures for managing water supply and disposal system that meet administrative, workplace and regulatory requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D9162 | SFIAQUA507C | Plan and design water supply and disposal systems | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCH94 | SFIAQU512 | Plan and design water supply and disposal systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEJ2 | SFI50119 | Diploma of Aquaculture | Qualification |