Unit of competency Outline
Date retreived
22/07/2026 12:10 PM AWST
22/07/2026 12:10 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Prepare plans and quality assurance procedures for environmental field activities
Prepare plans and quality assurance procedures for environmental field activities
Unit of competency
National Code
MSL976002
MSL976002
State Code
AWN69
AWN69
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/08/2016
Field of Education
080317 - Quality Management
Original Release Date
16/08/2016
Nominal Hours
60
Description
This unit of competency covers the ability to use a systematic planning process to develop plans and quality assurance procedures covering multiple environmental field monitoring or survey activities for a wide range of environmental systems. The unit covers both defining the purpose of the environmental field activities and establishing their overall requirements. These requirements will involve the collection of appropriate data, the monitoring/survey methodologies to be used, and the design and documentation of a final overall implementation plan that includes budget, training and resource requirements. This unit of competency does not cover the development of monitoring or survey protocols.This unit of competency is applicable to laboratory supervisors and managers working in the environmental industry sector. All operations must comply with relevant standards, appropriate procedures and/or workplace requirements.While no specific licensing or certification requirements apply to this unit at the time of publication, laboratory operations are governed by relevant legislation, regulations and/or external accreditation requirements. Local requirements should be checked.
Notes
Elements and Performance Criteria
1 Establish the overall requirements of the field activities
- 1.1 Identify key stakeholders along with their potential interests, sensitivities, roles and responsibilities
- 1.2 Clarify the purpose and general objectives of the field activities with stakeholders and the level/detail of information required
- 1.3 Identify and accurately interpret all statutory requirements that apply to the field activities
- 1.4 Identify and interpret all existing workplace requirements associated with field monitoring and/or survey activities
- 1.5 Analyse drivers and constraints that may influence field activities
- 1.6 Refine and document the detailed objectives of the field activities with senior management and key stakeholders
2 Scope all requirements to collect appropriate data under field conditions
- 2.1 Identify the type, quantity and quality of data needed to meet the defined objectives
- 2.2 Identify sites or areas and resources required for all planned field activities
- 2.3 Define data quality procedures that must be incorporated in all field activities
- 2.4 Identify risks, environmental and safety issues associated with field activities
- 2.5 Inspect all sites or areas and assess them against defined requirements and any standards that apply to the field activities
- 2.6 Refine and document all requirements necessary to collect appropriate field data
3 Select and adapt field protocols covering the field activities
- 3.1 Identify field protocols that may be suitable for the defined field activities
- 3.2 Review and select the most appropriate field protocol for the defined field activities
- 3.3 Develop and document detailed methodologies, risk management plans and general time schedules covering all the planned field activities
4 Design and document a detailed implementation plan
- 4.1 Define all staff tasks, roles and responsibilities and the overall staff work program
- 4.2 Identify and list all resources needed to undertake all planned field activities and associated pre- and post-field activities
- 4.3 Design and document an overall implementation plan covering all workplace field activities
- 4.4 Meet with all staff involved and clearly outline the objectives, field methodologies and data quality procedures covered in the implementation plan
5 Prepare a financial budget and staff training and work programs
- 5.1 Develop a detailed budget, including contingencies covering all planned field activities
- 5.2 Develop detailed staff work programs for individual field activities in the context of the implementation plan
- 5.3 Identify competencies required to undertake all field activities and, if appropriate, develop appropriate training programs for all staff involved in field activities
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WA754 | MSL976002A | Prepare plans and quality assurance procedures for environmental field activities | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAC16 | MSL976004 | Prepare plans and quality assurance procedures for environmental field activities | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZR8 | MSL60116 | Advanced Diploma of Laboratory Operations | Qualification |
| AZS1 | MSL50116 | Diploma of Laboratory Technology | Qualification |