Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain rail signalling power supplies

Install and maintain rail signalling power supplies

Unit of competency
National Code
UEENEEN105A
State Code
WC727
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
14/08/2013
State Implementation and Classification
Approved Date
24/07/2014
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
24/07/2014
Nominal Hours
36
Description
1)Scope:1.1) DescriptorThis unit covers installation and maintenance of rail signalling power supplies. It encompasses working safely and to installation/maintenance standards, matching equipment with that specified for a given location, terminating cables and connecting wiring, compliance and functional testing, certifying and reporting.
Notes
Elements and Performance Criteria
1 Prepare to install and maintain signalling power supplies
  • 1.1 OHS procedures for a given work area are identified, obtained and understood.
  • 1.2 Established OHS risk control measures and procedures are followed in preparation for the work.
  • 1.3 Safety hazards which have not previously been identified are noted, and established risk control measures are implemented.
  • 1.4 Nature of the work and location of power supply is determined by site inspection and from job instructions, specifications and/or diagrams.
  • 1.5 Materials needed for the installation, maintenance/repair work are obtained in accordance with established procedures and checked against job requirements.
  • 1.6 Tools, equipment and testing devices needed to install or maintain/repair power supplies are obtained in accordance with established procedures and checked for correct operation and safety.
2 Install and maintain signalling power supplies
  • 2.1 OHS risk control measures and procedures for carrying out the work are followed.
  • 2.2 Power supply is installed to comply with technical standards and job specifications and requirements.
  • 2.3 Wiring is run and cables terminated to comply with technical standards and job specifications and requirements.
  • 2.4 Tests are conducted to ensure installed, maintained/ repaired power supply complies with specifications and functions as intended.
  • 2.5 Installation, maintenance/repair of power supply is carried out efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
  • 2.6 Correct functioning of equipment is established from reference to manuals, system specifications and commissioning data.
  • 2.7 Faults are identified by reference to appropriate technical information and applying knowledge of power supplies to logical fault finding techniques.
  • 2.8 Faulty, worn, damaged or insecure components are replaced, repaired or secured in accordance with manufacturer specifications and enterprise requirements.
  • 2.9 Established methods for dealing with unexpected situations are discussed with appropriate person(s) and documented.
3 Complete installation and maintain of signalling power supplies
  • 3.1 OHS work completion risk control measures and procedures are followed.
  • 3.2 Work site is cleaned and made safe in accordance with established procedures.
  • 3.3 Work completion is documented and appropriate person(s) notified in accordance with established procedures, and relevant reports produced.
RANGE STATEMENT
10) This relates to the unit as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance.
This unit shall be demonstrated in relation to:
The relevant State/Territory codes of practice and safe working requirements.
Code of practice for the defined interstate rail network.
Activities may include procedures for the isolation of power supplies and may also include the use of plans and drawings, manufacturer’s / enterprise specifications and manuals.
Activities may also include: determining fit for purpose, installation of power supplies, maintenance of power supplies, terminating cables and connecting wiring, compliance and functional testing and completing the necessary documentation.
Codes/practices could include dial before you dig.
Plant may include: portable generators
Equipment relevant to a particular rail network may include, but not be limited to, the following:
Electrical equipment may include; Power supplies, including; low voltage AC, low voltage DC, electro-hydraulic, electro, pneumatic, solar, generators, alternators, batteries and surge protection
Test equipment may include; multimeters, insulation resistance and continuity testers, battery testers, pneumatic pressure gauges and hydraulic pressure gauges
Technical report may include: incident report, electrical access report, site survey and data log report.
Power supplies may include: standby plants, battery chargers, solar supplies, regulated power supplies, uninterrupted power supplies, primary and secondary supplies
Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Section 2.1.
EVIDENCE GUIDE
9) The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.
The Evidence Guide forms an integral part of this unit. It must be used in conjunction with all components parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment
9.1)

Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the industry-preferred model for apprenticeships. However, where summative (or final) assessment is used it must include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. In some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety issues inherent in working with electricity, electrical equipment, gas or any other hazardous substance/material present a challenge for those determining competence. Sources of evidence need to be ‘rich’ in nature to minimise error in judgment.
Activities associated with normal everyday work influence decisions about how/how much the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit
9.2)

Before the critical aspects of evidence are considered all prerequisites must be met.
Evidence for competence in this unit shall be considered holistically. Each Element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the ‘Assessment Guidelines - UEE11’. Evidence shall also comprise:
A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the performance criteria and range statement
Apply sustainable energy principles and practices as specified in the performance criteria and range statement
Demonstrate an understanding of the essential knowledge and associated skills as described in this unit. It may be required by some jurisdictions that RTOs provide a percentile graded result for the purpose of regulatory or licensing requirements.
Demonstrate an appropriate level of skills enabling employment
Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures
Demonstrated consistent performance across a representative range of contexts from the prescribed items below:
Install and maintain rail signalling power supplies as described in 8) and including:
Interpreting specifications and circuit diagrams correctly
Maintaining, repairing and installing power supplies correctly
Using appropriate diagnostic and fault finding techniques
Using tools and test instruments correctly
Following relevant codes of practice, procedures and requirements
Completing relevant technical reports, records and documentation, and
Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items
Note:
Successful completion of relevant vendor training may be used to contribute to evidence on which competency is deemed. In these cases the alignment of outcomes of vendor training with performance criteria and critical aspects of evidence shall be clearly identified.

Context of and specific resources for assessment
9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions.
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.
These should be used in the formal learning/assessment environment.

Note:
Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy.
The resources used for assessment should reflect current industry practices in relation to installing and maintaining signalling power supplies.

Method of assessment
9.4)

This unit shall be assessed by methods given in Volume 1, Part 3 ‘Assessment Guidelines’.
Note:
Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires assessment in a structured environment which is intended primarily for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units
9.5)

For optimisation of training and assessment effort, competency development in this unit may be arranged in combination with other competencies required by a given enterprise installation, maintenance and repair functions.
Concurrent assessment may include:
UEENEEN102A Assemble and wire internal electrical rail signalling equipment
UEENEEN118A Find and repair rail signal system faults
Replaced By
State Code National Code Title Type
OBX81 UEERS0010 Install and maintain rail signalling power supplies Unit of competency
State Code National Code Title Type
A143 UEE41211 Certificate IV in Electrical - Rail Signalling Qualification