Unit of competency Outline
Date retreived
22/07/2026 7:26 AM AWST
22/07/2026 7:26 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply the principles for the application of slurry surfacing
Apply the principles for the application of slurry surfacing
Unit of competency
National Code
RIICBS405D
RIICBS405D
State Code
WH070
WH070
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
State Implementation and Classification
Approved Date
30/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
30/05/2014
Nominal Hours
40
Description
This unit describes a participant’s skills and knowledge required to apply the principles for the application of slurry surfacing in Civil construction. This unit is appropriate for those working in supervisory or technical specialist roles.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for applying the principles for the application of slurry surfacing
- 1.1 Access, interpret and apply, the principles for the application of slurry surfacing, documentation and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Ensure a job plan, is available which makes best use of the available resources and meets the task requirements
- 1.4 Identify the training requirements of team members and develop training plans
2. Ensure appropriate initiation of tasks is carried out
- 2.1 Confirm that the necessary resources are available
- 2.2 Ensure clear and timely instructions are communicated to team members and others involved
- 2.3 Ensure appropriate set out of tasks
3. Oversee the execution of tasks
- 3.1 Monitor slurry surfacing application task performance to ensure it achieves the required outcomes
- 3.2 Initiate adjustments to work practices or job plan and ensure safe execution of work and achievement of required outcomes
- 3.3 Ensure plant equipment and tools maintenance requirements are carried out and recorded
- 3.4 Implement training plans
4. Report on the execution of tasks
- 4.1 Complete and submit reports
- 4.2 Recommend changes to improve the safety, efficiency and effectiveness of the execution of slurry surfacing application tasks
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OBO98 | RIICBS405E | Supervise micro surfacing operations | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J637 | RII40813 | Certificate IV in Civil Construction Design | Qualification |
| AZF5 | RII40815 | Certificate IV in Civil Construction Design | Qualification |
| AZE3 | RII50515 | Diploma of Civil Construction Design | Qualification |
| J666 | RII50513 | Diploma of Civil Construction Design | Qualification |
| J663 | RII40613 | Certificate IV in Civil Construction Operations | Qualification |
| AZA5 | RII40615 | Certificate IV in Civil Construction Operations | Qualification |
| AZC9 | RII40715 | Certificate IV in Civil Construction Supervision | Qualification |
| J659 | RII40713 | Certificate IV in Civil Construction Supervision | Qualification |