Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Muck out tunnel earthworks

Muck out tunnel earthworks

Unit of competency
National Code
RIICTC304D
State Code
WH178
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
27/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
27/05/2014
Nominal Hours
12
Description
This unit describes a participant’s skills and knowledge required to muck out tunnel earthworks in Civil Construction.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to muck out tunnel earthworks
  • 1.1 Access, interpret and apply muck out tunnel earthworks documentation and ensure the work activity is compliant
  • 1.2 Obtain, interpret, clarify and confirm work instructions before proceeding Identify, obtain and implement traffic signage requirements
  • 1.3 Select and wear personal protective equipment appropriate for work activities
  • 1.4 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
  • 1.5 Select and check for faults plant, tools and equipment to carry out tasks
  • 1.6 Identify, address and report environmental issues, potential hazards and risks
2. Bar/scale down loose material
  • 2.1 Identify and position plant and equipment in accordance with job requirements
  • 2.2 Bar/scale down loose material safely
3. Remove spoil by hand
  • 3.1 Remove excavated muck
  • 3.2 Transport muck to spoil heap
4. Load spoil by machine
  • 4.1 Install spoil haulage lines, rail and conveyor system to engineers’ and/or manufacturer’s specifications
  • 4.2 Operate mucking machines
  • 4.3 Inspect and maintain conveyors to schedule
5. Remove spoil
  • 5.1 Operate hauling engine smoothly
  • 5.2 Operate continuous conveyor system
  • 5.3 Maintain dust controls throughout mucking process
6. Conduct housekeeping activities
  • 6.1 Clear work area and dispose of or recycle materials
  • 6.2 Clean, check, maintain and store plant, tools and equipment
  • 6.3 Carry out housekeeping activities
No information
No information
Replaces
State Code National Code Title Type
WB513 RIICTC304A Muck out tunnel earthworks Unit of competency
Replaced By
State Code National Code Title Type
OCW75 RIICTC304E Muck out tunnel earthworks Unit of competency
State Code National Code Title Type
BFA8 RII30919 Certificate III in Civil Construction Qualification
AZB0 RII30915 Certificate III in Civil Construction Qualification