Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install turnouts

Install turnouts

Unit of competency
National Code
TLIS0003
State Code
OCY97
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
29/01/2021
State Implementation and Classification
Approved Date
01/04/2021
Field of Education
039907 - Rail Operations
Original Release Date
01/04/2021
Nominal Hours
20
Description
This unit involves the skills and knowledge required to install turnouts in accordance with rail industry standards, safeworking and regulatory requirements, and workplace procedures.It includes transporting and installing points and crossings; and completing required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.The unit involves the application of routine operational principles and procedures when installing points and crossings, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to install turnouts
  • 1.1 Work requirements are established to identify scope of work and resources required
  • 1.2 Construction design or plan is obtained and interpreted
  • 1.3 Required resources are acquired in accordance with workplace procedures
  • 1.4 Hazards are identified, risks are assessed and control measures are implemented
  • 1.5 Existing track work is removed from worksite
  • 1.6 Track bed is prepared for installation of points and crossings in accordance with workplace procedures
2 Prepare points and crossings for transport
  • 2.1 Transport requirements are confirmed
  • 2.2 Transport requirements are followed in accordance with manufacturer instructions and workplace procedures
  • 2.3 Documentation is completed and processed in accordance with workplace procedures
3 Install turnouts
  • 3.1 New points and crossings are installed in accordance with specified design, manufacturer instructions and workplace procedures
  • 3.2 Dimensions, geometry, condition and operation are checked for compliance with rail industry standards in accordance with design, manufacturer instructions and workplace procedures
  • 3.3 Non-compliances are repaired or replaced, as required in accordance with workplace procedures
4 Complete installation process
  • 4.1 Documentation is completed in accordance with organisational procedures
  • 4.2 Appropriate personnel are informed that the installation has been completed, in accordance with organisational procedures
No information
No information
Replaces
State Code National Code Title Type
AVH61 TLIS3045 Install turnouts Unit of competency