Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan the implementation of revegetation works

Plan the implementation of revegetation works

Unit of competency
National Code
AHCNAR402A
State Code
D7064
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/06/2011
State Implementation and Classification
Approved Date
13/10/2014
Field of Education
050301 - Horticulture
Original Release Date
13/10/2014
Nominal Hours
35
Description
This unit covers planning the implementation of revegetation works and defines the standard required to: establish the purpose and client preferences for the site to be revegetated; carry out a site visit and confirm any planning requirements; develop a plan for the site, detailing the resources required and the program of works; develop timelines for the establishment and maintenance phases of the project; document the staged implementation plan.
Notes
Elements and Performance Criteria
1. Carry out preliminary planning activities for revegetation works
  • 1.1. Client preferences and contract requirements including the scope of the work for the revegetation project are confirmed and verified.
  • 1.2. Specific statutory obligations and site responsibilities that may affect the implementation of works are identified.
  • 1.3. An initial site visit is conducted to verify the biophysical and other factors of the project area including environmental considerations and historical modifications.
  • 1.4. Occupational Health and Safety (OHS) obligations associated with the revegetation works are identified, OHS hazards are assessed and controls developed, costed and documented in the implementation plan according to enterprise guidelines.
  • 1.5. The availability, quantity and costs of plants and other materials listed in the project schedules are verified.
2. Prepare a staged plan of work
  • 2.1. Resources, tools and equipment required for revegetation procedures and ongoing maintenance of the site are identified, costed and availability confirmed with suppliers, contractors and appropriate personnel.
  • 2.2. Site access and establishment issues are investigated to consider and plan for the environmental impacts of site work practices, avoid safety hazards to workers or the public, and minimise disruption to site works during the construction period.
  • 2.3. A program of works is prepared to provide a sequential allocation of resources and work tasks to meet the project contract timelines.
  • 2.4. Timelines are developed for site establishment, the establishment period and maintenance of works.
  • 2.5. Seasonal factors and impacts are incorporated in the staging strategy to allow for planting supply and care, wet day access, machinery use, fire hazards and establishment period.
  • 2.6. Where required, special project works related to habitat resource development and enhancement are included in the staged implementation plan.
  • 2.7. Document the staged implementation plan.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole.
Revegetation works may include:
works for disturbed, degraded or remnant natural sites.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
establish the purpose and client preferences for the site to be revegetated
carry out a site visit and confirm any planning requirements
develop a plan for the site, detailing the resources required and the program of works
develop timelines for the establishment and maintenance phases of the project
document the staged implementation plan.
Context of and specific resources for assessment
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.
Replaces
State Code National Code Title Type
S2639 RTD4020A Plan the implementation of revegetation works Unit of competency
Replaced By
State Code National Code Title Type
BAL68 AHCNAR402 Plan the implementation of revegetation works Unit of competency