Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop, plan and implement an appropriate building or construction planning process
Develop, plan and implement an appropriate building or construction planning process
Unit of competency
National Code
CPCCBC6009A
CPCCBC6009A
State Code
W9309
W9309
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/03/2013
Field of Education
040303 - Building Construction Management
Original Release Date
27/03/2013
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to develop, plan and implement an appropriate building or construction planning process. It applies to the strategic development and implementation of an organisation's project and organisational planning. The unit applies to the management and review systems of an organisation involved in residential and/or commercial projects of significant size and complexity. It supports the establishment of a soundly based contract planning service necessary to produce accurate and successful project outcomes in accordance with organisational guidelines and legislation, codes and standards governing project completion.
Notes
Elements and Performance Criteria
1. Quantify and qualify factors to be included in the organisational on-site planning system.
- 1.1. Strategic factors impacting on the planning process are identified and quantified in accordance with legislative, code, standard and organisational requirements.
- 1.2. Range and scope of activities to be undertaken by the organisation are quantified.
- 1.3. Strategic and operational planning structures within the organisation are reviewed and qualified regarding their information needs.
2. Establish and implement organisational on-site planning system.
- 2.1. Design and development of the organisational project planning system is facilitated.
- 2.2. Criteria for personnel and processes concerned with construction planning are established.
- 2.3. Endorsement of senior management is facilitated and obtained for implementation of the system.
- 2.4. Senior project staff are selected and appointed to meet organisational needs.
3. Establish and implement a planning quality control system.
- 3.1. Construction methodologies applicable to the type of construction project are identified and applied to the planning quality control process.
- 3.2. Implementation of a review and feedback system using company project records and performance criteria is facilitated and directed.
4. Develop and implement an organisational feedback system.
- 4.1. Means of effectively communicating planning information within the strategic and operational sectors of the organisation is established and implemented.
- 4.2. Organisational feedback system based on performance, progress and project outcomes and other strategic factors is developed and strategically implemented.
5. Establish a recording and evaluation system.
- 5.1. Documentation and recording system that meets organisational needs for ongoing recording and evaluation of the planning process is instituted and managed.
- 5.2. Strategic balances and checks, which enable the ongoing maintenance of the quality of the planning system, are developed and applied.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Strategic factors impacting on the planning process include:
clients and client needs
location of projects
logistics and location of personnel
market focus and structure of the organisation
organisation information needs and timelines
relevant legislative requirements, codes and standards
strategic organisational objectives
type of work being undertaken.
Legislative, code and standard requirements include:
application of the Building Code of Australia (BCA) related to the size and complexity of the project and the class of building being constructed
council and other relevant planning approval processes
OHS and other workplace standards
relevant state or territory licensing arrangements.
Criteria for personnel and processes include:
appropriate experience and qualifications of participants
correct and timely selection of key project supervisors and administrators
effective lines and methods of communication
suitability and timing of communication
suitability of documentation and reporting methods
suitability of work habits and timeliness of personnel.
Planning quality control process includes:
documentation and graphical representation of data
establishment of performance benchmarks
evaluation and review methods and practices
feedback loops and information extraction
personnel and system information gathering and insert points
project review meetings and project progress reporting.
Recording and evaluation include:
key point data availability and crisis flagging
maintenance and redevelopment of information recording systems
manual and electronic data recording processes
performance data entry and responsibility
programmed and crisis evaluation strategies.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Strategic factors impacting on the planning process include:
clients and client needs
location of projects
logistics and location of personnel
market focus and structure of the organisation
organisation information needs and timelines
relevant legislative requirements, codes and standards
strategic organisational objectives
type of work being undertaken.
Legislative, code and standard requirements include:
application of the Building Code of Australia (BCA) related to the size and complexity of the project and the class of building being constructed
council and other relevant planning approval processes
OHS and other workplace standards
relevant state or territory licensing arrangements.
Criteria for personnel and processes include:
appropriate experience and qualifications of participants
correct and timely selection of key project supervisors and administrators
effective lines and methods of communication
suitability and timing of communication
suitability of documentation and reporting methods
suitability of work habits and timeliness of personnel.
Planning quality control process includes:
documentation and graphical representation of data
establishment of performance benchmarks
evaluation and review methods and practices
feedback loops and information extraction
personnel and system information gathering and insert points
project review meetings and project progress reporting.
Recording and evaluation include:
key point data availability and crisis flagging
maintenance and redevelopment of information recording systems
manual and electronic data recording processes
performance data entry and responsibility
programmed and crisis evaluation strategies.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by effective development, planning and implementation of an appropriate building or construction planning process.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
develop a strategic focus on the mechanisms implemented to enable the construction planning process
interpret organisational information and reporting requirements, which results in the establishment of mechanisms that demonstrate those needs are being met
implement and maintain mechanisms and systems which enable demonstrable improvements to occur within the organisational construction planning process
delegate effectively and oversee tasks
communicate effectively both verbally and in writing with owners, senior management and employees.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
documentation that should normally be available in a building or construction office to comply with legislation and the organisation policies
relevant codes, standards and regulations
office equipment, including calculators, photocopiers and telephone systems
computers with appropriate software to view 2-D CAD drawings, run costing programs, record and print copies
a technical reference library with current publications on measurement, design, building construction to support underpinning knowledge and manufacturers' product literature
copies of appropriate awards and workplace agreements
a suitable work area appropriate to the planning process.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed by effective development, planning and implementation of an appropriate building or construction planning process.
This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
develop a strategic focus on the mechanisms implemented to enable the construction planning process
interpret organisational information and reporting requirements, which results in the establishment of mechanisms that demonstrate those needs are being met
implement and maintain mechanisms and systems which enable demonstrable improvements to occur within the organisational construction planning process
delegate effectively and oversee tasks
communicate effectively both verbally and in writing with owners, senior management and employees.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
documentation that should normally be available in a building or construction office to comply with legislation and the organisation policies
relevant codes, standards and regulations
office equipment, including calculators, photocopiers and telephone systems
computers with appropriate software to view 2-D CAD drawings, run costing programs, record and print copies
a technical reference library with current publications on measurement, design, building construction to support underpinning knowledge and manufacturers' product literature
copies of appropriate awards and workplace agreements
a suitable work area appropriate to the planning process.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCO65 | CPCCBC6009 | Develop, plan and implement a building and construction planning process | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W619 | CPC60208 | Advanced Diploma of Building and Construction (Management) | Qualification |
| J500 | CPC60212 | Advanced Diploma of Building and Construction (Management) | Qualification |