Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Coordinate the design of micro-grid renewable energy systems

Coordinate the design of micro-grid renewable energy systems

Unit of competency
National Code
UEERE0057
State Code
OET92
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/12/2022
State Implementation and Classification
Approved Date
16/03/2023
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
16/03/2023
Nominal Hours
45
Description
This unit involves the skills and knowledge required to coordinate the design of micro-grid renewable energy systems.It includes safe work practices, site survey processes and procedures, service provider responsibilities, consulting with qualified people to assess client energy demand requirements and assessing micro-grid equipment options to meet client requirements and site conditions. It also covers advice to the client on energy storage standards, codes of practices, government/utilities incentive schemes, and information related to the design and installation of a micro-grid renewable energy generation system.This unit is appropriate for Licenced Electricians or Electrical Engineers with responsibility for coordinating site survey for, and the design of, micro-grid renewable energy systems.Licensing, legislative or certification requirements that apply to this unit may differ between jurisdictions and system types. They should be checked prior to commencing this unit.
Notes
Elements and Performance Criteria
1 Prepare to coordinate design of micro-grid
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures relevant to site assessment are obtained and applied
  • 1.2 Scope and scale of proposed micro grid is determined from project brief
  • 1.3 Stakeholders and required experts that need to be consulted and involved are identified and engaged
  • 1.4 Site survey plan is developed in consultation with required personnel
  • 1.5 Equipment and documentation needed for the site survey are obtained in accordance with workplace procedures
  • 1.6 Requirements for site survey, contractual obligations, and roles/responsibilities of people involved are discussed with stakeholder/s
  • 1.7 Requirements for production and approval of design are identified and documented
2 Coordinate site survey for a micro-grid
  • 2.1 Details of project brief are verified, and any discrepancies recorded
  • 2.2 Current stakeholder/s energy usage data is collected and expected future energy generation needs are discussed, and expectations are clarified
  • 2.3 Energy resource data is collected
  • 2.4 Information about site access, building structures and layout, and existing electrical infrastructure is gathered and documented
  • 2.5 Site hazards that may impact installation are identified and documented
  • 2.6 Reports and data from technical experts are obtained and added to site survey data
  • 2.7 Distribution/network requirements are determined where required
  • 2.8 Site survey data is analysed and report prepared
3 Coordinate the design of micro-grid
  • 3.1 Any relevant industry standards, building/electrical regulations, codes and jurisdictional approval process are identified
  • 3.2 Qualified person/s are consulted and briefed as required on site conditions, and client requirements and expectations
  • 3.3 Options for micro-grid energy generation equipment to meet site requirements and client expectations are identified and noted
  • 3.4 Different options for micro-grid energy storage equipment to meet site requirements and client expectations are identified and noted
  • 3.5 Placement of system components is considered, and any restrictions or issues of concern noted
  • 3.6 Micro-grid system performance standards and compliance methods are applied to the design development
  • 3.7 Safety, functional and budgetary considerations are incorporated in design
  • 3.8 Qualified person/s are consulted to ensure micro-grid system design draft complies with the design brief, industry standards and regulations, job requirements and workplace procedures
  • 3.9 Micro-grid system design is documented in line with industry standards and regulations, job requirements and workplace procedures
  • 3.10 Micro-grid system design is documented and submitted to relevant person/s for approval