Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Perform Risk Analysis of Generation Plant
Perform Risk Analysis of Generation Plant
Unit of competency
National Code
UEPOPS414A
UEPOPS414A
State Code
S5257
S5257
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/05/2011
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
31/05/2011
Nominal Hours
60
Description
1)
This unit deals with the skills and knowledge required to identify and analyse the risk in loss of generation/production plant.
This unit deals with the skills and knowledge required to identify and analyse the risk in loss of generation/production plant.
Notes
Elements and Performance Criteria
1 Identify risk
- 1.1 Plant and process maintenance and operational procedures are obtained
- 1.2 Plant operating and maintenance history is obtained including relevant incident and failure reports
- 1.3 Applicable Occupational Health and Safety and environmental standards are researched
- 1.4 Applicable plant and process technical documentation is obtained
- 1.5 Analysis objectives are clearly defined
2 Conduct analysis
- 2.1 Analysis is completed using appropriate methodology in accordance with enterprise/site requirements
- 2.2 Incident scenarios are established, and consequences analysed and prioritised for risk
- 2.3 Defined objectives are obtained during analysis
- 2.4 Specialist assistance is sought when required
3 Produce and implement/monitor recommendations
- 3.1 Recommendations for preventative action are produced against each risk scenario as appropriate
- 3.2 Implementation of recommendations are monitored in accordance with enterprise/site requirements
4 Complete documentation
- 4.1 Risk analysis, processes, conclusions, scenarios and recommendations are documented
- 4.2 Risk analysis report is produced and submitted in accordance with enterprise/site requirements
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AYF77 | UTPNEG221A | Perform risk analysis of generation plant | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE400 | UEPOPS414B | Perform risk analysis of generation plant | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S508 | UEP50106 | Diploma of ESI Generation (Systems Operations) | Qualification |