Unit of competency Outline

Date retreived
22/07/2026 4:25 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Recommission marine engine systems

Recommission marine engine systems

Unit of competency
National Code
AURR346760B
State Code
D7667
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
21/06/2011
State Implementation and Classification
Approved Date
27/09/2011
Field of Education
031701 - Maritime Engineering
Original Release Date
27/09/2011
Nominal Hours
20
Description
This unit of competency describes the skills and knowledge required to prepare a marine engine system for use after seasonal shutdown and storage.It requires the ability to identify and confirm work requirements, test and recommission engine system and complete work finalisation processes.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare for work
  • 1.1. Confirm nature and scope of work to be carried out
  • 1.2. Locate occupational health and safety (OHS) and workplace environmental and sustainable procedures and practices, applicable to the work
  • 1.3. Access and interpret repair method, workshop manuals and manufacturer information
  • 1.4. Check and prepare tools, equipment and materials
  • 1.5. Set up work area
2. Recommission engine systems
  • 2.1. Carry out recommissioning procedures in accordance with manufacturer and component supplier specifications, and OHS and workplace environmental and sustainable procedures and practices
  • 2.2. Test engine systems and compare to manufacturer and component specifications
  • 2.3. Determine and report engine systems which fail testing and gain rectification approval from customer
  • 2.4. Repair and test failed systems
  • 2.5. Commission engine system
  • 2.6. Determine the need for water testing
3. Clean up work area and finalise work
  • 3.1. Clean and inspect equipment and tooling according to workplace requirements
  • 3.2. Tag unserviceable equipment and faults identified in accordance with workplace requirements
  • 3.3. Clean work area, dispose of waste and scrap, and store tools and equipment in accordance with workplace procedures
  • 3.4. Finalise and process work completion documentation and give to appropriate persons, as required
  • 3.5. Prepare report for the customer detailing work undertaken and technical or regulatory requirements
No information
No information
Replaces
State Code National Code Title Type
W2951 AURR346760A Recommission engine systems Unit of competency
Replaced By
State Code National Code Title Type
WF331 AURRTE3009 Recommission marine engine systems Unit of competency
State Code National Code Title Type
D537 AUR20611 Certificate II in Marine Qualification