Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and maintain micro hydro energy systems to power conversion equipment

Install and maintain micro hydro energy systems to power conversion equipment

Unit of competency
National Code
UEERE0075
State Code
OEX49
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
20/12/2022
State Implementation and Classification
Approved Date
16/03/2023
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
16/03/2023
Nominal Hours
27
Description
This unit involves the skills and knowledge required to install and maintain micro-hydro energy systems to power conversion equipment.It includes preparing, installing and maintaining micro-hydro systems as well as maintenance and reporting activities.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations, which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, is required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to work on micro-hydro systems
  • 1.1 WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
  • 1.2 WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
  • 1.3 Nature, scope and location of the work are determined from documentation or relevant person/s
  • 1.4 Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately
  • 1.5 Engagement and scheduling of contractors and other experts required for completion of work are arranged, and roles, responsibilities and levels of authority confirmed
  • 1.6 Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.7 Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures
2 Install micro-hydro systems
  • 2.1 Nature of the installation is verified from design documentation and any design concerns identified referred to designer
  • 2.2 Transport of equipment to the site is confirmed in accordance with workplace procedures
  • 2.3 Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project
  • 2.4 Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.5 System is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance
  • 2.6 Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
  • 2.7 Quality checks of installed apparatus are conducted in accordance with workplace procedures
  • 2.8 Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
  • 2.9 Worksite is cleaned and made safe in accordance with workplace procedures
  • 2.10 ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
3 Maintain micro-hydro systems
  • 3.1 Scope and nature of the maintenance is verified from relevant documentation and relevant person/s
  • 3.2 Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures
  • 3.3 System is dismantled in accordance with manufacturer guides and instructions from relevant person/s
  • 3.4 Component parts are tagged during dismantling to ensure correct and efficient reassembly and stored to protect against loss or damage
  • 3.5 System is reassembled in required sequence with all parts placed, secured and connected in accordance with manufacturer guides or industry practice
  • 3.6 Repairs are completed in accordance with industry standards, regulations and manufacturer specification
  • 3.7 Testing, commissioning and reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
  • 3.8 Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.9 ‘As-installed’ system and associated equipment are documented, manuals updated, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
No information