Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Cut over metallic conductor cable in the access network

Cut over metallic conductor cable in the access network

Unit of competency
National Code
ICTCBL317
State Code
AWK38
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
18/01/2016
State Implementation and Classification
Approved Date
05/07/2016
Field of Education
031307 - Communications Technologies
Original Release Date
05/07/2016
Nominal Hours
30
Description
This unit describes the skills and knowledge required to cut over and rearrange new and existing distribution cables in the telecommunications access network.It applies to linesworkers, jointers or technicians from carriers, contractors or other service providers who work on new or existing copper cables in the access network.Work functions in the occupational areas where this unit may be used may be subject to regulatory requirements. Refer to the Implementation Guide Companion Volume or the relevant regulator for specific guidance on requirements.
Notes
Elements and Performance Criteria
1. Prepare for cable modification and cutover
  • 1.1 Obtain relevant legislation, codes, regulations, client practices, manufacturer's guidelines and standards for for the job.
  • 1.2 Obtain project plan from appropriate personnel and use plan to scope work for job
  • 1.3 Arrange for access to worksite, according to local government or other authority requirements
  • 1.4 Inspect site to develop a work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards
  • 1.5 Determine cable route and type of cable from project plan, taking into account the location of other services
  • 1.6 Obtain required plant, tools, safety equipment and materials
  • 1.7 Prepare detailed plan of cut over tasks according to project plan, job scope, legislative and other requirements, and obtain necessary approvals
  • 1.8 Notify client and network carrier of proposed cutover activity and proposed disruption to services that may impact on their service level agreements (SLAs)
  • 1.9 Undertake additional preparatory non-jointing work, as required, according to client practices and site conditions
2. Joint and cut over cable
  • 2.1 Prepare cabinet, joint enclosure and jointing chambers for cable handling, entry and sealing requirements
  • 2.2 Joint cable according to jointing sequence, materials, connectors and joint type, location, client practices and manufacturer’s guidelines
  • 2.3 Test cable for performance and rectify cutover faults relating to cutover according to location, materials available and client practices, and record test results for future reference
  • 2.4 Seal all joints according to cable type, location, client practices and manufacturer’s guidelines
3. Clean up worksite and complete documentation
  • 3.1 Complete reports on cutover installation and design amendments to reflect existing cable layout
  • 3.2 Place and secure cables to supports in jointing chamber or cabinet according to client practices
  • 3.3 Mark up As Built plans for return to client for their records
  • 3.4 Recover obsolete materials and return to appropriate point for disposal
  • 3.5 Restore siteaccording to client practices or approving authority requirements
  • 3.6 Notify appropriate personnel about completion of cutover and obtain sign off
No information
No information
Replaced By
State Code National Code Title Type
OBA60 ICTCBL326 Cut over metallic conductor cable in the access network Unit of competency