Unit of competency Outline

Date retreived
23/07/2026 1:32 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct external load-lift operations

Conduct external load-lift operations

Unit of competency
National Code
AVIY0094
State Code
OFG65
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
28/05/2025
State Implementation and Classification
Approved Date
13/08/2025
Field of Education
030717 - Plant And Machine Operations
Original Release Date
13/08/2025
Nominal Hours
10
Description
This unit involves the skills and knowledge required to conduct external load-lift operations from a helicopter in compliance with relevant regulatory requirements of the Civil Aviation Safety Authority (CASA) and national operating standards.It includes preparing for load-lifting operations, performing load-lifting operations, concluding load-lifting operations, and responding to external load operational emergencies and abnormal situations.This unit addresses aviation technical skill requirements (physical, mental and task-management abilities) related to aircraft operational duties of flight crew and contributes to safe and effective performance in complex aviation operational environments.Operations are conducted across a variety of operational contexts within the Australian aviation industry.Licensing, legislative, regulatory or certification requirements are applicable to this unit.
Notes
Elements and Performance Criteria
1 Prepare for load-lifting operations
  • 1.1 External load characteristics and dimensions are determined and calculated in accordance with workplace procedures
  • 1.2 Aerial delivery equipment is prepared and checked as required in accordance with equipment manuals and publications
  • 1.3 Helicopter cargo hook system is prepared and checked for correct operation
  • 1.4 Aircraft safety hazards are identified in accordance with workplace procedures
  • 1.5 Aircraft power availability is considered
  • 1.6 Wind speed and direction are considered
  • 1.7 Approach and overshoot paths are considered
  • 1.8 Load-lifting location and surrounds are checked for suitability
  • 1.9 External load-lifting plan is considered and discussed with other crew members
2 Perform load-lifting operations
  • 2.1 Helicopter is manoeuvred or directed to external load-lifting point
  • 2.2 External load is connected in accordance with workplace procedures
  • 2.3 Situational awareness of inflight load stability and aircraft flight performance is maintained
  • 2.4 External load is released at nominated delivery point
3 Conclude load-lifting operations
  • 3.1 Aerial delivery equipment is recovered and checked for serviceability, as required
  • 3.2 Aircraft external load hook equipment and control systems are secured and checked for serviceability
4 Respond to external load operational emergencies and abnormal situations
  • 4.1 External load operational emergencies are identified, diagnosed and communicated
  • 4.2 External load operational emergency or remedial actions are undertaken to maintain safety of flight
No information
No information
Replaces
State Code National Code Title Type
BID67 AVIY0065 Conduct external load-lift operations Unit of competency
State Code National Code Title Type
BMG0 AVI40225 Certificate IV in Airborne Operations Qualification
BMF9 AVI30525 Certificate III in Airborne Operations Qualification