Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Produce bridge drawings and sketches

Produce bridge drawings and sketches

Unit of competency
National Code
RIICTB203E
State Code
OCX78
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
25/01/2021
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
20
Description
This unit describes the skills and knowledge required to produce bridge drawings and sketches in civil construction, including two-dimensional, three-dimensional, and orthographic sketches as well as the development of specifications.It applies to those working in operational roles. They generally work under supervision to undertake a prescribed range of functions involving known routines and procedures and take some responsibility for the quality of work outcomes.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to Produce drawings and sketches
  • 1.1 Access, interpret and apply documentation required to produce bridge drawings and sketches
  • 1.2 Confirm and apply safety requirements according to job and site requirements
  • 1.3 Select plant, tools and equipment required to carry out tasks and check for faults
  • 1.4 Identify, confirm, and locate materials required for work application
  • 1.5 Obtain, interpret and comply with quality requirements, format and drawing conventions
  • 1.6 Select drawing type according to job requirements
  • 1.7 Identify bridge features, site dimensions and orientation, structures and services according to job requirements
2. Create sketches, orthographic drawings and sectional views
  • 2.1 Select drawing medium according to job requirements
  • 2.2 Prepare two dimensional drawings and sketches according to job requirements
  • 2.3 Prepare three dimensional drawings and sketches according to job requirements
  • 2.4 Prepare sectional details of structural elements and elevations according to job requirements
  • 2.5 Include symbols and abbreviations
  • 2.6 Prepare title panels to confirm drawing used is the current version
3. Develop specifications
  • 3.1 Identify purpose of specifications as they relate to bridge drawings
  • 3.2 Identify elements as suitable for use in specifications according to job requirements
  • 3.3 Prepare specifications for a bridge project according to job requirements
No information
No information
Replaces
State Code National Code Title Type
WH164 RIICTB203D Produce drawings and sketches Unit of competency
State Code National Code Title Type
BGL0 RII30920 Certificate III in Civil Construction Qualification