Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Setup and maintain concrete paver stringlines
Setup and maintain concrete paver stringlines
Unit of competency
National Code
RIICRC312
RIICRC312
State Code
WC331
WC331
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
16/08/2012
Field of Education
030901 - Construction Engineering
Original Release Date
16/08/2012
Nominal Hours
40
Description
This unit covers the conduct of setting-up and maintaining concrete paver stringlines in the civil construction industry. It includes planning and preparing, inspecting equipment and layout, placing stringlines and pins, installation and removal of access gates and the storage and maintenance of stringlines. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for operations
- 1.1 Access, interpret and apply compliance documentation relevant to the work activity
- 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task
- 1.3 Identify, obtain and implement signage requirements from the project traffic management plan
- 1.4 Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults
- 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task
2. Inspect equipment and layout
- 2.1 Conduct visual inspection of stringlinesto ensure compliance with workplace specifications
- 2.2 Conduct inspection of stringline flags and pins and ensure compliance with worksite plans
- 2.3 Inspect hand or car winch and other pulling devices for safe and accurate operation
- 2.4 Conduct visual inspection of ground conditions for conformance to work requirements
- 2.5 Load and unload stringline pins onto vehicle within workplace specifications
- 2.6 Set up barricades and exclusion zones around work area/PTE
3. Conduct placement of stringline and pins
- 3.1 Drive in stringline pins and placement of pins within workplace specifications
- 3.2 Tension stringlines within workplace specifications
- 3.3 Use tension measuring devices to establish accurate tensions on stringlines
- 3.4 Set up anchor pins within workplace specifications
- 3.5 Communicate with work teams using workplace hand or radio communication procedures
- 3.6 Tie off stringline to anchor pins
- 3.7 Release stringline from anchor pins
- 3.8 Set out from survey pins heights/level and undertake visual verification of alignment
- 3.9 Reset stringline to specification after it breaks
4. Install and remove access gates
- 4.1 Release stringline from the flags and fix on ground to allow vehicles to cross
- 4.2 Install and remove protective devices for crossing vehicles where required
- 4.3 Verify stringline vertical and horizontal upon resetting via measurement and visual inspection
5. Store and maintain pins and stringline
- 5.1 Check and maintain clamps, nuts and drive pins
- 5.2 Clean, check, maintain and store stringline to protect it from damage
Relevant compliance documentation may include:
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of first aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
pads
highways
freeways
airport runways
tunnels
rail corridors
housing estates
car parks
container yards
hard stands
footpaths and bikeways
traffic
Task may include:
access and egress vehicle areas
installing pins, stringlines, tension wire lines
levelling stringlines
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plants, tools and equipment may include:
shovels
hammers
PPE
tensioning devices
measuring tapes
depth gauges
standard tool kits
string lines
pins/stakes
survey equipment
communication equipment
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
legislative, organisational and site requirements and procedures
manufacturer’s guidelines and specifications
Australian standards
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation
Safety requirements may include:
OHS requirements in accordance with state or territory legislation and regulations, organisational safety policies and procedures, and project safety plan, including protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of first aid equipment, hazard control and hazardous materials and substances
safe operating procedures including recognising and preventing hazards associated with high voltage power lines, uneven/unstable terrain, trees, overhead service lines, bridges, surrounding buildings, obstructions, structures, facilities, dangerous materials, recently filled trenches, other machines, personnel, traffic control, working at heights, working in proximity to others, worksite visitors and the public
safe parking practices including ensuring access ways are clear, equipment/machinery is away from overhangs and refuelling sites, safe distance are kept from excavations, and areas secured from unauthorised access or movement
recognising hazards and risks including uneven/unstable terrain, trees, fires, overhead and underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials
emergency procedures related to equipment operation including emergency shutdown and stopping, extinguishing equipment fires, organisational first aid requirements and evacuation
Site may include:
formed/prepared roads
pads
highways
freeways
airport runways
tunnels
rail corridors
housing estates
car parks
container yards
hard stands
footpaths and bikeways
traffic
Task may include:
access and egress vehicle areas
installing pins, stringlines, tension wire lines
levelling stringlines
Traffic may include:
congested urban environments
low traffic rural areas
off-road un-trafficked areas
parking sites
pedestrian areas
Plants, tools and equipment may include:
shovels
hammers
PPE
tensioning devices
measuring tapes
depth gauges
standard tool kits
string lines
pins/stakes
survey equipment
communication equipment
Environmental protection requirements may include:
organisational/project environmental management plan
waste management
water quality protection
noise
vibration
dust and clean-up management
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting concrete paver stringlines
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of concrete paver stringlines
working with others to undertake and complete the concrete paver stringlines operations in a way that meets all of the required outcomes
consistent timely completion of concrete paver stringline operations that safely, effectively and efficiently meets the required outcomes
conduct concrete paver stringlines operations by:
install and rectify on a minimum of 2 occasions, 2 access points
install pins to correct height and horizontal adjustment for a minimum distance of 500 metres
install step-up flags
tension string lines to specifications
conduct measurement checks
conduct visual inspections and checks
place at least one crossover
demonstrate the removal and storage of a string line.
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in Civil Construction. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete the setting up, monitoring and maintaining concrete paver stringlines
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
knowledge of the requirements, procedures and instructions for conducting concrete paver stringlines
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of concrete paver stringlines
working with others to undertake and complete the concrete paver stringlines operations in a way that meets all of the required outcomes
consistent timely completion of concrete paver stringline operations that safely, effectively and efficiently meets the required outcomes
conduct concrete paver stringlines operations by:
install and rectify on a minimum of 2 occasions, 2 access points
install pins to correct height and horizontal adjustment for a minimum distance of 500 metres
install step-up flags
tension string lines to specifications
conduct measurement checks
conduct visual inspections and checks
place at least one crossover
demonstrate the removal and storage of a string line.
Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
Assessment of this competency requires typical resources normally used in Civil Construction. Selection and use of resources for particular worksites may differ due to the site circumstances.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required
Method of assessment
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
written and/or oral assessment of the candidate’s required knowledge
observed, documented and/or first hand testimonial evidence of the candidate’s:
implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistent achievement of required outcomes
first hand testimonial evidence of the candidate’s:
working with others to undertake and complete the setting up, monitoring and maintaining concrete paver stringlines
Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WH128 | RIICRC312D | Setup and maintain concrete paver stringlines | Unit of competency |