Unit of competency Outline

Date retreived
22/07/2026 9:18 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Manufacture and install continuous handrailing and special stair components

Manufacture and install continuous handrailing and special stair components

Unit of competency
National Code
CPCCJS3004
State Code
OCP86
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
24/12/2024
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040311 - Carpentry And Joinery
Original Release Date
01/06/2021
Nominal Hours
40
Description
This unit of competency specifies the skills and knowledge required to manufacture, join and install continuous handrailing and special stair components, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit includes wreaths, scrolls, bullnose steps and decorative features connecting straight lengths of handrail to wreaths or scrolls, with the use of handrail fittings or bolts to form a continuous handrail system.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
  • 1.1 Read and interpret work instructions and plan sequence of work.
  • 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
  • 1.3 Select tools and equipment, check for serviceability and report any faults.
  • 1.4 Select and use personal protective equipment (PPE) for each part of the task.
  • 1.5 Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
  • 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Prepare wreath for continuous handrailing.
  • 2.1 Determine pitch of stair and change of direction of handrail from stair design.
  • 2.2 Set out wreath and assess total area required to determine thickness of material to be prepared.
  • 2.3 Prepare material, cut square to wreath length, and set-out to shape for dressing.
  • 2.4 Form wreath to square section with designated twist, and free of bumps.
3 Join and mould wreath to straight sections.
  • 3.1 Mould wreath to handrail shape and fine sand to smooth finish.
  • 3.2 Measure straight sections of handrail and cut to length with ends square to join wreath with tight joints.
  • 3.3 Pre-fit handrail in lengths, disassemble and rejoin in location.
4 Manufacture scroll and wreath, and join to handrail.
  • 4.1 Set out and prepare scroll and wreath to designed shape.
  • 4.2 Prepare materials to scroll and wreath dimensions, apply set out patterns and form scroll and wreath to basic shapes.
  • 4.3 Mould scroll and wreath to handrail shape and fine sand to smooth finish.
  • 4.4 Join scroll and wreath to handrail with tight joints.
5 Manufacture and install bullnose treads.
  • 5.1 Review design and method of constructing bullnose tread.
  • 5.2 Manufacture bullnose tread and riser and fix block support.
  • 5.3 Cut and dress tread with nosing to shape.
  • 5.4 Fit bullnose tread, riser and to stairs and secure in location.
6 Manufacture and install brackets and decorative features.
  • 6.1 Fix brackets and scotia and fix into place using the cut and mitred string method.
  • 6.2 Fix decorative features and sand surfaces to smooth finish to requirements.
7 Clean-up.
  • 7.1 Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
  • 7.2 Check, maintain and store tools and equipment and report any faults.
No information
No information
Replaces
State Code National Code Title Type
W9419 CPCCJS3004A Manufacture and install continuous handrailing and special stair components Unit of competency
State Code National Code Title Type
BGD6 CPC31920 Certificate III in Joinery Qualification