Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Supervise overburden dump operations
Supervise overburden dump operations
Unit of competency
National Code
RIIMEX408
RIIMEX408
State Code
ODB87
ODB87
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
10/09/2021
Field of Education
030303 - Mining Engineering
Original Release Date
10/09/2021
Nominal Hours
70
Description
This unit describes the skills and knowledge required to supervise overburden dump operations in the extractive industry. It involves interpreting and applying geological, geotechnical and survey data, and implementing hazard identification and risk assessment processes.The unit applies to those working in supervisory roles in the extractive industry. They generally perform a broad range of operational activities in their area of responsibility and are responsible for monitoring a safe work environment.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to supervise overburden dump operations
- 1.1 Obtain, interpret and confirm work requirements
- 1.2 Access, interpret and apply overburden dump operations documentation and confirm the work activity is compliant
- 1.3 Access, share and clarify the geotechnical and survey data required for overburden dump operations with team members
- 1.4 Select and wear personal protective equipment according to site requirements
- 1.5 Conduct inspection of overburden dump and identify potential hazards and environmental issues, implement control measures within scope of own role and escalate where required
- 1.6 Prepare and implement an action plan in consultation with team members according to job and site requirements
- 1.7 Identify team training needs and confirm required training is provided
- 1.8 Obtain and make available resources and equipment required for overburden dump operations
- 1.9 Communicate and clarify instructions with involved personnel according to job requirements
- 1.10 Identify training needs for personnel involved in work activity and make arrangements to meet identified needs
- 1.11 Confirm lighting, barriers and signage are erected according to site requirements
2. Establish overburden dump area
- 2.1 Confirm correct dump design and location according to job and site requirements
- 2.2 Confirm overburden dump foundation is prepared according to workplace procedures and approved overburden dump design
- 2.3 Monitor placement of overburden material and confirm use of techniques that maintain safety and dump stability, and comply with site, geotechnical and environmental requirements
- 2.4 Confirm overburden dump has adequate drainage to minimise ponding, erosion and contamination of surrounding areas
- 2.5 Monitor progress of overburden dump formation to determine staged rehabilitation requirements according to work plan
- 2.6 Monitor overburden dump structure and surrounding area with visual checks to assess safety, stability and compliance with overburden dump design
3. Monitor dust suppression and overburden dump infrastructure maintenance
- 3.1 Monitor overburden structure and operations to confirm dust control measures are effective and meet site requirements
- 3.2 Adjust overburden dump activities to prevailing weather conditions and site dust suppression requirements
- 3.3 Maintain overburden dump access roads according to site requirements
- 3.4 Maintain safety and condition of bunds according to site requirements
- 3.5 Maintain overburden dump drains and rehabilitated areas according to legislative and site requirements
4. Review and report on overburden dump operations
- 4.1 Monitor and report on the effectiveness of operating procedures according to site requirements
- 4.2 Complete and submit reports according to site requirements
No information
No information
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| BGQ0 | RII40120 | Certificate IV in Surface Extraction Operations | Qualification |