Unit of competency Outline

Date retreived
22/07/2026 11:10 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Perform landing duties (chaser)

Perform landing duties (chaser)

Unit of competency
National Code
FPIHAR2204B
State Code
D6025
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
20/05/2011
State Implementation and Classification
Approved Date
04/08/2014
Field of Education
050501 - Forestry Studies
Original Release Date
04/08/2014
Nominal Hours
40
Description
This unit describes the outcomes required to direct placement of logs brought to the landing by cable operations and unhooking the logs from the chokers. The unit includes assisting with line shiftsCompliance with licensing, legislative, regulatory or certification requirements may be required in various jurisdictionsThis unit replaces FPIHAR2204B Perform landing duties (chaser)
Notes
Elements and Performance Criteria
1. Prepare for chaser operations
  • 1.1. Applicable Occupational Health and Safety (OHS), environmental, legislative and organisational requirements relevant to performing landing duties (chaser)are identified and followed
  • 1.2. Work order is reviewed and checked with appropriate personnel
  • 1.3. Type and quantity of logs to be extracted are identified and assessed for safe working conditions and environmental protection measures
  • 1.4. Equipment is selected appropriate to work requirements and checked for operational effectiveness in line with manufacturer's recommendations
  • 1.5. Chaser and cable operations activities are planned in line with site procedures
  • 1.6. Communication with others is established and maintained in line with OHS requirements
2. Land and unhook logs
  • 2.1. All work is conducted in line with work order, environmental and OHS requirements
  • 2.2. Logs entering landing area are monitored and the yarder assisted to place them using signals in line with the cable logging code of practice
  • 2.3. Logs are checked to have at least two thirds of their length on the landing before release
  • 2.4. Stability of logs is checked and adjusted when chokers or grapple ropes are slackened
  • 2.5. Chokers or grapples are removed, strawlines coiled and butt rigging checked and adjusted in line with directions from the yarder operator
  • 2.6. Landing area is maintained within industry standards to enable safe and clear log, equipment and personnel movement
  • 2.7. Chaser process and equipment faults are reported to the yarder in line with site procedures
3. Assist with line shifts
  • 3.1. All logs to be hauled with existing line position are cleared before line shift is initiated
  • 3.2. Stumps are notched in line with code requirements for the rigging method to be used
  • 3.3. Slack is pulled in on all lines prior to release of existing rigging
  • 3.4. Rigging components are dismantled from the existing line, checked and set up on the new line
  • 3.5. Obstructions which may cause binding or damage during hauling are moved as required
  • 3.6. Rigging slinger is assisted with rigging of spars, tail trees and intermediate supports
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
OHS requirements:
are to be in line with applicable Commonwealth, State or Territory legislation and regulations, and organisational safety policies and procedures, and may include:
personal protective equipment and clothing
safety equipment
first aid equipment
fire fighting equipment
hazard and risk control
fatigue management
elimination of hazardous materials and substances
safe forest practices including required actions relating to forest fire
manual handling including shifting, lifting and carrying
Environmental requirements may include:
legislation
organisational policies and procedures
workplace practices
Legislative requirements:
are to be in line with applicable Commonwealth, State or Territory legislation, regulations, certification requirements and codes of practice and may include:
award and enterprise agreements
industrial relations
Australian Standards
confidentiality and privacy
OHS
the environment
equal opportunity
anti-discrimination
relevant industry codes of practice
duty of care
heritage and traditional land owner issues
Organisational requirements may include:
legal
organisational and site guidelines
policies and procedures relating to own role and responsibility
quality assurance
procedural manuals
quality and continuous improvement processes and standards
OHS, emergency and evacuation procedures
ethical standards
recording and reporting requirements
equipment use and maintenance and storage requirements
environmental management requirements (waste disposal, recycling and re-use guidelines)
Chasers
direct the landing of logs in conjunction with the yarder and unhook the logs at the landing site
Work order is to include:
instructions for the chaser operations to recover felled logs from the work site
and may include:
type
size
length
quantity
grade
instructions for the environmental monitoring of work and procedures
environmental care requirements relevant to the work
Appropriate personnel may include:
supervisors
suppliers
clients
colleagues
managers
Logs are to include:
the finished product or trunk of a tree after trimming and cross cutting has occurred
and may be:
hardwood or softwood
for production or non-production purposes
Environmental protection measures may include:
ground growth
canopy
general forest lean
wind speed and direction
fallen trees
density of trees
ground slope
soil and water protection
ground hazards and obstacles
contingencies for modifying operations during wet or other adverse weather conditions
Equipment may include:
rigging equipment
and is to include:
procedures for equipment lock-out such as protecting operators and co-workers from accidental injury by isolating the machine
Cable operations may include:
activities covering a full range of species, log sizes, falling and retention densities, slope, other environmental conditions
use of cable systems including high lead (no skyline), standing skyline and a running skyline with hauling both uphill and downhill
Logs attached optimising payload without exceeding the lift or haul capacity of the system
Communication may include:
verbal and non-verbal language
hand or other agreed signals
eye contact with other operators or personnel
active listening
questioning to clarify and confirm understanding
use of electronic communication devices
Landing
is the location where the yarder is positioned to receive the logs
Yarder
is the crane-like vehicle which winches the logs from the felling site to the landing using a cable system
Stability
is the physical stability of the log in-situ, that it is safe to hook up and not likely to roll off a rock, move on another log or slide down the hillside
Chokers and grapple ropes
are the steel wire ropes used to hook up logs ready for cable extraction
Butt rigging
is the sliding rig or tow to which the choker and grapple ropes are connected
Reporting may include:
landing and unhooking methods or problems
tree type
size
length
diameter
inspection
quality outcomes
hazards
incidents
equipment malfunctions
Line shifts
are the moving of rigging lines from one area of operation to a new area
Stump notching
is the process for securing rigging components, cables and ropes
Rigging components may include:
strawlines
blocks
sheaves
ropes
shackles
pins
skyline
tail rope
lines
straps
mobile tail anchors
spars
intermediate supports
bridling
Rigging slinger role includes:
deciding what logs to take out first and being responsible for getting the logs to the landing without breaking them
directing the choker setter personnel in hooking up logs
transmitting signals to and from the yarder
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
A person who demonstrates competency in this unit must be able to provide evidence that they can safely and efficiently perform chaser operations to recover felled logs within organisational requirements
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to, and satisfy, all of the requirements of the elements of this unit and include demonstration of:
following applicable Commonwealth, State or Territory legislative and regulatory requirements and codes of practice relevant to performing landing duties (chaser)
following organisational policies and procedures relevant to performing landing duties (chaser)
the ability to perform chaser operations to recover felled logs in line with the work order and within prescribed organisational tolerances
the ability to assist in shifting lines in line with the hook tender's instructions
Context of and specific resources for assessment
Competency is to be assessed in the workplace or realistically simulated workplace
Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
Assessment of required knowledge, other than confirmatory questions, will usually be conducted in an off-site context
Assessment is to follow relevant regulatory or Australian Standards requirements
The following resources should be made available:
workplace location or simulated workplace
materials and equipment relevant to undertaking work applicable to this unit
specifications and work instructions
Method of assessment
Assessment must satisfy the endorsed Assessment Guidelines of the FPI11 Training Package
Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of required knowledge
Assessment must be by direct observation of tasks, with questioning on required knowledge and it must also reinforce the integration of employability skills
Assessment methods must confirm the ability to access and correctly interpret and apply the required knowledge
Assessment may be applied under project-related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
Assessment may be in conjunction with assessment of other units of competency
The assessment environment should not disadvantage the candidate
Assessment practices should take into account any relevant language or cultural issues related to Aboriginality, gender or language backgrounds other than English
Where the participant has a disability, reasonable adjustment may be applied during assessment
Language and literacy demands of the assessment task should not be higher than those of the work role
Replaced By
State Code National Code Title Type
AXK42 FWPHAR2204 Perform landing duties (chaser) Unit of competency
State Code National Code Title Type
J610 FPI20213 Certificate II in Harvesting and Haulage Qualification
J459 FPI20211 Certificate II in Harvesting and Haulage Qualification