Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Direct cast in-situ piling operations

Direct cast in-situ piling operations

Unit of competency
National Code
RIICFW307D
State Code
WH098
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
07/12/2014
State Implementation and Classification
Approved Date
28/05/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
28/05/2014
Nominal Hours
20
Description
This unit describes a participant’s skills and knowledge required to direct cast in-situ piling operations in Civil Construction.This unit is appropriate for those working in operational roles. No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare to direct in-situ piling operations
  • 1.1 Access, interpret and apply documentation to the direction of cast in-situ piling operations and ensure the work activity is compliant
  • 1.2 Obtain, interpret, clarify and confirm work instructions and resolve coordination requirements before proceeding
  • 1.3 Confirm and apply environmental protection and safety requirements
  • 1.4 Select and wear correct personal protective equipment appropriate for work activities
  • 1.5 Obtain, interpret and implement traffic management signage requirements
  • 1.6 Select, and check for faults, plant, tools and equipment to carry out tasks
  • 1.7 Identify, address and report environmental issues, potential hazards and risks
  • 1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Direct the rig, locate and prepare pile positions
  • 2.1 Establishing the location of piles from reference points and set out
  • 2.2 Establish recovery pegs and conduct on-going measurements to ensure correct location
  • 2.3 Position plant and related equipment and conduct pre-start checks
  • 2.4 Provide guidance for boring of holes
  • 2.5 Direct installation of the casing in the bored hole if applicable
  • 2.6 Prepare pile to receive concrete
3. Assist with placing concrete
  • 3.1 Place concrete into pile
  • 3.2 Identify the process of placing concrete in dry situations
  • 3.3 Identify the process of placing concrete in wet situations
4. Carryout post-operational requirements
  • 4.1 Provide direction for the relocation of boring rig
  • 4.2 Provide direction for the removal of boring rig from site on completion of work
  • 4.3 Clear work area and dispose of or recycle materials
  • 4.4 Clean, check, maintain and store plant, tools and equipment
No information
No information
Replaced By
State Code National Code Title Type
OCX76 RIICFW307E Direct cast in-situ piling operations Unit of competency