Unit of competency Outline

Date retreived
22/07/2026 1:31 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install stormwater and sub-soil drainage systems

Install stormwater and sub-soil drainage systems

Unit of competency
National Code
CPCPDR2024A
State Code
WF859
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
07/02/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040327 - Plumbing
Original Release Date
20/06/2014
Nominal Hours
12
Description
This unit of competency specifies the outcomes required to install stormwater and sub-soil drainage systems to an approved point of discharge.
Notes
Elements and Performance Criteria
1 Prepare for work.
  • 1.1 Plans and specifications are obtained.
  • 1.2 Work health and safety (WHS) and environmental requirements associated with installing stormwater and sub-soil drainage systems are adhered to throughout the work.
  • 1.3 Quality assurance requirements are identified and adhered to according to workplace requirements.
  • 1.4 Tasks are planned and sequenced in conjunction with others involved in or affected by the work.
  • 1.5 Tools and equipment, including personal protective equipment, are selected and checked for serviceability.
  • 1.6 Work area is prepared to support efficient installation of the stormwater and sub-soil drainage system.
2 Determine installation requirements.
  • 2.1 Position of installation is determined according to plans, specifications and site requirements, including legal point of discharge.
  • 2.2 Quantity and type of materials required are calculated from design drawings and specifications and comply with relevant Australian standards, local authorities' requirements and job plans and specifications.
  • 2.3 Materialsare identified, ordered and collected according to workplace procedures.
  • 2.4 Materials are checked for compliance with docket and order form, and for acceptable condition.
3 Install stormwater and sub-soil drainage.
  • 3.1 Size and location of excavation are marked out to comply with plans and specifications, and installation and site requirements.
  • 3.2 Site is excavated according to plans and specifications, site requirements and relevant Australian standards, ensuring minimum damage to surrounding structures or environment.
  • 3.3 Pipework, and stormwater and sub-soil drainage system are installed according to plans and specifications, site requirements or job instructions, and relevant Australian standards, with consideration given to existing pipework and other services.
  • 3.4 Sustainability principles and concepts are observed when preparing for and undertaking work process.
  • 3.5 Installation is tested to comply with relevant Australian standards and relevant statutory and regulatory authorities’ requirements.
  • 3.6 Inspection openings and covers are fitted according to relevant Australian standards and job specifications.
  • 3.7 Excavation is back-filled according to relevant Australian standards and job specifications.
4 Clean up.
  • 4.1 Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specification.
  • 4.2 Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and workplace procedures.
  • 4.3 Informationis accessed and documentation completed according to workplace requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include:
handling of materials
hazard control
hazardous materials and substances
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including recognising and preventing hazards associated with:
dirt mounds
electricity
excavation equipment and plant
hazardous materials
other machines
pits
poles
recently filled trenches
surrounding structure and facilities
traffic control
trip hazards
underground services
uneven and unstable terrain
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of first aid equipment
use of tools and equipment
workplace environment and safety.

Environmental requirements cover water quality management and may include:
clean-up protection
stormwater protection
waste management.

Quality assurance requirements may include:
environment policy
Environment Protection Authority (EPA)
internal company quality assurance policy and risk management strategy
International Standards Organisation
site safety plan
workplace operations and procedures.

Legal point of discharge may be:
gutter
on-site storage tank or disposal pit
stormwater drain or easement
sub-soil distribution system or soak well.

Materials may include:
unplasticised polyvinyl chloride (PVC-U), reinforced concrete, cast iron and vitreous clay pipes
other approved materials.

Sustainability principles and concepts:
cover the social, economic and environmental use of resources to meet current and future needs
may include:
correct handling of hazardous materials
disposing of waste material to ensure minimal environmental impact
efficient and legal point of water discharge
efficient energy and water use
efficient use and recycling of material
selecting appropriate components to ensure minimal environmental impact.

Statutory and regulatory authorities include:
commonwealth, state or territory, and local authorities administering applicable Acts, regulations and codes of practice.

Tools and equipment may include:
compression cutters
dropsaws
files
grinders
hacksaws
hand and power tools
hand excavating tools
levelling equipment
measuring equipment
mechanical excavating equipment
testing equipment
trench shoring equipment.

Information may include:
charts and hand drawings
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions
material safety data sheets (MSDS)
memos
organisation work specifications and requirements
plans and sketches
regulatory and legislative requirements, particularly those pertaining to:
building codes
WHS and environmental requirements
plumbing regulations
relevant Australian standards
safe work procedures relating to installing stormwater and sub-soil drainage systems
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of:
locating, interpreting and applying relevant information, Australian standards and specifications to set out, install and test stormwater and sub-soil drainage systems
applying safety requirements throughout the work sequence, including electrical safety requirements and the use of personal protective clothing and equipment
given the plans and specifications, installing a stormwater and sub-soil drainage system, including:
a stormwater drain which is to connect from a downpipe to an approved point of discharge
a subsoil drain which is to connect to a disposal and collection pit
both drains are to be at least 4 metres in length, ensuring:
applying sustainability principles and concepts
correctly identifying location, design and details of proposed installation
correctly selecting and using appropriate processes, tools and equipment
completing all work to specification
complying with regulations, relevant Australian standards and organisational quality procedures and processes
communicating and working effectively and safely with others.

Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the minimum task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry-related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
D7425 CPCPDR2014A Install stormwater and sub-soil drainage systems Unit of competency
Replaced By
State Code National Code Title Type
OCO50 CPCPDR2025 Install stormwater and sub-soil drainage systems and drain work site Unit of competency