Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Align and install traction lift equipment

Align and install traction lift equipment

Unit of competency
National Code
UEEEL0026
State Code
OCB59
TGA Status
Current
DTWD Status
Approved
Current Release Number
2.00
Current Release Date
29/11/2024
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
12/07/2021
Nominal Hours
18
Description
This unit involves the skills and knowledge required to align and install traction lift mechanical and electrical equipment.It includes planning, aligning and installing lift mechanical and electrical equipment by working safely in alignment of lift structures such as measuring, marking out and aligning of lift installations, including machine room equipment, lift well equipment, the lift car and associated equipment and landing door frames and doors. It also includes setting out of multiple lift wells in varying configurations and the installations of well and pit equipment, lift car equipment, superstructure and counterweights, machine room equipment, landing, door frames and door, landing buttons and indicator boxes; and completing workplace reporting activities.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Notes
Elements and Performance Criteria
1 Prepare to install lift equipment
  • 1.1 WHS/OHS requirements and workplace procedures for a given work area are identified and applied
  • 1.2 WHS/OHS risk control measures and workplace procedures in preparation for the work are followed
  • 1.3 Scope of work to be undertaken is identified from site plans, drawings, specifications and/or discussions with appropriate person/s
  • 1.4 Advice is sought from work supervisor to ensure work is coordinated effectively with others
  • 1.5 Tools, equipment and alignment devices needed to carry out work are obtained in accordance with workplace procedures and checked for correct operation and safety
2 Align and install lift equipment
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 2.2 Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace safety procedures
  • 2.3 Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.4 Equipment is installed straight and square in the required locations and within acceptable tolerances
  • 2.5 Equipment is aligned and installed in accordance with manufacturer specifications and regulatory requirements
  • 2.6 Existing safe work methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures
  • 2.7 Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • 2.8 Checks of the quality of installed equipment are undertaken in accordance with workplace procedures
  • 2.9 Equipment installation is carried out efficiently without unnecessary waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices
3 Complete and report alignment and installation activities
  • 3.1 WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2 Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3 Final checks are made to ensure that the installed equipment conforms to job specifications and workplace requirements
  • 3.4 'As-installed' equipment is documented and an appropriate person/s notified in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
WC510 UEENEEG167A Align and install traction lift equipment Unit of competency