Unit of competency Outline

Date retreived
22/07/2026 9:51 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Conduct stockpile dozer operations

Conduct stockpile dozer operations

Unit of competency
National Code
RIIMPO305A
State Code
WB704
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
02/09/2009
State Implementation and Classification
Approved Date
06/07/2010
Field of Education
030717 - Plant And Machine Operations
Original Release Date
06/07/2010
Nominal Hours
40
Description
Notes
Elements and Performance Criteria
No information
may include:
legislative, organisation and site requirements and procedures
manufacturer's guidelines and specifications
Australian standards
codes of practice
Employment and workplace relations legislation
Equal Employment Opportunity and Disability Discrimination legislation

ripping
pushing and levelling of coal
pad preparation
drainage
dump establishment
maintenance

shift briefings
handover details
work orders

plant identification/allocation
nature and scope of the task
achievement targets
working conditions
adequacy of site lighting
defects to equipment
hazards and potential hazards
coordination requirements/issues

legislation and regulations
relevant Australian standards
management plans
OHS policy
code of practice
manufacturer's instructions
safe working procedures (or equivalent)

Specific
boarding and disembarkation procedures
spontaneous combustion awareness
slippery conditions
uneven surfaces
operational signal procedures
equipment lowering and lifting


coal haulers
pumps
lighting sets
other dozers

Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for conducting stockpile dozer operations
implementation of requirements, procedures and techniques for the safe, effective and efficient completion of stockpile dozer operations
working with others to undertake and complete the stockpile dozer operations that meet all of the required outcomes
consistent, timely completion of stockpile dozer operations that safely, effectively and efficiently meet the required outcomes

Context of and specific resources for assessment
This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
Aboriginal people and other people from a non English speaking background may have second language issues.
Assessment of this competency requires typical resources normally used in the work environment. Selection and use of resources for particular worksites may differ due to site circumstances.
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
consistently achieving the required outcomes

first hand testimonial evidence of the candidate's:

working with others to undertake and complete the stockpile dozer operations

Guidance information for assessment
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Replaced By
State Code National Code Title Type
D9348 RIIMPO305B Conduct coal stockpile dozer operations Unit of competency
No information