Unit of competency Outline

Date retreived
22/07/2026 10:06 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate and monitor pumping systems and equipment

Operate and monitor pumping systems and equipment

Unit of competency
National Code
PMAOPS222
State Code
AXN40
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
02/06/2016
State Implementation and Classification
Approved Date
05/08/2016
Field of Education
030717 - Plant And Machine Operations
Original Release Date
05/08/2016
Nominal Hours
40
Description
This unit of competency covers the skills and knowledge required to operate pumping systems, which are driven by prime movers; and ancillary equipment.The pumps covered by this unit of competency typically are used for hydrocarbon transmission lines.This unit of competency applies to operators who are required to start up and shut down the equipment, monitor its performance, identify operational problems and take appropriate action.This unit of competency applies to an individual who may work alone although under routine direction and supervision. They may work as part of a team or group and will work in liaison with other shift team members and the control room operator, as appropriate.No licensing, legislative or certification requirements apply to this unit at the time of publication
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Receive and give shift handover
  • 1.2 Identify work requirements
  • 1.3 Identify and control hazards
  • 1.4 Coordinate with appropriate personnel
  • 1.5 Check for recent work undertaken on plant item
  • 1.6 Note any outstanding/incomplete work
  • 1.7 Check operational status of equipment
2 Operate pumping systems in accordance with procedures
  • 2.1 Identify the type of pumping system and duty
  • 2.2 Operate ancillary equipment
  • 2.3 Adjust pumping system as appropriate to type and duty
  • 2.4 Complete routine checks, logs and paperwork, taking action on unexpected observations, readings and trends
  • 2.5 Verify the operational condition of all flanges, gaskets and seals to ensure that the operational integrity of these components is maintained within stated operational tolerances and to avoid any environmental damage
3 Recognise and take action on abnormal situations in accordance with procedures
  • 3.1 Monitor pumping system, filter system and lubrication system frequently and critically throughout shift using measured/indicated data and senses
  • 3.2 Identify impacts of any changes upstream and downstream
  • 3.3 Recognise situations which may require action
  • 3.4 Resolve routine problems
  • 3.5 Take actions on other abnormal situations to make safe and have the situation resolved
4 Isolate and de-isolate equipment
  • 4.1 Complete any required pre-start checks
  • 4.2 Start up/shut down/changeover pumping system according to plant type and duty in liaison with other personnel
  • 4.3 Isolate pumping system
  • 4.4 Make safe for required work
  • 4.5 Check pumping system is ready to be returned to service
  • 4.6 De-isolate and prepare pumping system for return to service
No information
No information
Replaces
State Code National Code Title Type
W8855 PMAOPS222B Operate and monitor pumping systems and equipment Unit of competency