Unit of competency Outline
Date retreived
22/07/2026 7:47 PM AWST
22/07/2026 7:47 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Construct roads and pavements
Construct roads and pavements
Unit of competency
National Code
LGAWORK306A
LGAWORK306A
State Code
C5888
C5888
TGA Status
Deleted
Deleted
DTWD Status
Deleted
Deleted
State Implementation and Classification
Approved Date
14/08/2014
Field of Education
030901 - Construction Engineering
Original Release Date
14/08/2014
Nominal Hours
80
Description
This unit covers the construction of roads and pavements.
Notes
Elements and Performance Criteria
1 Divert or drain water from the work site
- 1.1 Appropriate drainage is provided to allow for the diversion of uncontaminated stormwater from the work site and to prevent damage to the environment.
- 1.2 Environmental protection devices are installed as required to meet environmental regulations.
2 Set up for road construction
- 2.1 Levels and construction lines and pegs are set out to plans.
- 2.2 Site is grubbed and cleared of scrub and topsoil and subgrade is prepared according to plans and specifications.
- 2.3 Construction site is secured to prevent injury to the public and workers and damage to property.
- 2.4 Traffic control and warning signs are put into place in accordance with regulations.
3 Construct roads
- 3.1 Sub-grade is checked for soft spots, excavated and backfilled with selected materials and compacted in layers to specifications.
- 3.2 Subsoil and stormwater drainage are laid according to plans and excavation is backfilled with selected materials and compacted in accordance with the specifications.
- 3.3 Earth stabilisation is completed to specifications.
- 3.4 Pavement structure is constructed and completed in accordance with plans and specifications.
- 3.5 Road is shaped, contoured, compacted and prepared for road finish in accordance with plans and specifications.
- 3.6 Wearing surface materials are applied using selected equipment and tools in accordance with specifications.
- 3.7 Pavement lines are spotted in accordance with the traffic plan and applied to the surface in accordance with specifications.
- 3.8 Traffic control and warning signs are removed when all risks have ceased.
4 Install signage and furniture/appurtenances
- 4.1 Signage is positioned in accordance with the traffic plan and relevant standards .
- 4.2 Guard and handrails are placed in accordance with the traffic plan, specifications and relevant standards.
- 4.3 Light poles are placed and connected in accordance with the lighting plan and specifications.
- 4.4 Road fencing and noise insulation are constructed in accordance with plans and specifications.
- 4.5 Furniture /appurtenances are placed in accordance with plans and specifications.
5 Rehabilitate works area
- 5.1 Verges and medians are surfaced and planted or turfed according to landscaping plans and specifications.
- 5.2 Site is restored to the required condition in accordance with plans and specifications.
- 5.3 Private and public property areas and structures are restored in accordance with instructions.
6 Maintain records
- 6.1 Information is recorded in accordance with council and legislative requirements.
- 6.2 Details are recorded clearly, accurately and legibly.
- 6.3 Records are secured, made accessible and kept up to date.
The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.
Drainage may include:
table drain
mitre
kerb and channelling
run-offs
culverts
sump baskets
end walls
gabions
subsoil drains
leaching
weirs
leachate control
Subgrade may include:
clay, sand or gravel
modification treatments
soft spots
levelling
compaction
preparation
Stabilisation may include:
synthetics
soil and clay geomixes
concrete
criblock
gabions
reinforced earth
stone pitching
stone blocking
sand bagging
geotextile fabrics
spray seeding
Pavement may include:
crushed rock
soil aggregate
grader-placed
paver-placed
compacted by static roller, vibratory roller, pneumatic roller or concrete train
Surface type may include:
sealed
unsealed
gravel
bitumen
concrete
segmental pavers
asphalt
pre-mix
Earthworks may include:
clearing
grubbing
excavating
grading
levelling
trenching
compacting
Signage may include:
statutory
directional
information
road lines
road markings
reflectors
centre lines
directional lines
shoulder lines
Relevant standards may include:
AS1742.3
and other relevant standards
Furniture may include:
bins
bus shelters
guide posts
bollards
benches
seats
fences
guardrails
historical lamp posts
tables
rest areas
utility poles
handrails
noise suppressors
Drainage may include:
table drain
mitre
kerb and channelling
run-offs
culverts
sump baskets
end walls
gabions
subsoil drains
leaching
weirs
leachate control
Subgrade may include:
clay, sand or gravel
modification treatments
soft spots
levelling
compaction
preparation
Stabilisation may include:
synthetics
soil and clay geomixes
concrete
criblock
gabions
reinforced earth
stone pitching
stone blocking
sand bagging
geotextile fabrics
spray seeding
Pavement may include:
crushed rock
soil aggregate
grader-placed
paver-placed
compacted by static roller, vibratory roller, pneumatic roller or concrete train
Surface type may include:
sealed
unsealed
gravel
bitumen
concrete
segmental pavers
asphalt
pre-mix
Earthworks may include:
clearing
grubbing
excavating
grading
levelling
trenching
compacting
Signage may include:
statutory
directional
information
road lines
road markings
reflectors
centre lines
directional lines
shoulder lines
Relevant standards may include:
AS1742.3
and other relevant standards
Furniture may include:
bins
bus shelters
guide posts
bollards
benches
seats
fences
guardrails
historical lamp posts
tables
rest areas
utility poles
handrails
noise suppressors
Overview of assessment requirements
A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.
Critical aspects of evidence to be considered
Sub-grade materials are identified and appropriate treatments are selected.
Appropriate materials are selected for the construction of the works.
Appropriate construction resources and processes are used.
Plans and specifications are adhered to.
Safety on work sites is ensured.
Australian standards are met.
Context of assessment
May be assessed:
on the job
simulated workplace environment
written assignment
short-answer test
oral questioning
observation
or any combination of the above
Relationship to other units(prerequisite or co-requisite units)
To enable holistic assessment this unit may be assessed with other units that form part of the job role.
Method of assessment
The following assessment methods are suggested:
observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
written and/or oral questioning to assess knowledge and understanding
completion of workplace documentation
third-party reports from experienced practitioners
completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor
Evidence required for demonstration of consistent performance
Evidence will need to be gathered over time across a range of variables.
Resource implications
In accordance with a range of variable requirements.
A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.
Critical aspects of evidence to be considered
Sub-grade materials are identified and appropriate treatments are selected.
Appropriate materials are selected for the construction of the works.
Appropriate construction resources and processes are used.
Plans and specifications are adhered to.
Safety on work sites is ensured.
Australian standards are met.
Context of assessment
May be assessed:
on the job
simulated workplace environment
written assignment
short-answer test
oral questioning
observation
or any combination of the above
Relationship to other units(prerequisite or co-requisite units)
To enable holistic assessment this unit may be assessed with other units that form part of the job role.
Method of assessment
The following assessment methods are suggested:
observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
written and/or oral questioning to assess knowledge and understanding
completion of workplace documentation
third-party reports from experienced practitioners
completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor
Evidence required for demonstration of consistent performance
Evidence will need to be gathered over time across a range of variables.
Resource implications
In accordance with a range of variable requirements.
No information
| State Code | National Code | Title | Type |
|---|---|---|---|
| C748 | LGA30304 | Certificate III in Local Government (Operational Works) | Qualification |