Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Inspect electrical generators and diagnose faults

Inspect electrical generators and diagnose faults

Unit of competency
National Code
UEPMNT417B
State Code
WE277
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
25/07/2012
State Implementation and Classification
Approved Date
23/07/2014
Field of Education
030717 - Plant And Machine Operations
Original Release Date
23/07/2014
Nominal Hours
72
Description
1)Scope:1.1) DescriptorThis unit deals with the skills and knowledge required to conduct inspections and diagnose faults in electrical generating sets.
Notes
Elements and Performance Criteria
1 Plan and prepare for the work
  • 1.1 Maintenance and operating history is obtained
  • 1.2 Occupational Health and Safety standards, statutory requirements, relevant Australian standards, codes of practice, manufacturers’ specifications and enterprise procedures are identified, applied and monitored throughout the inspection procedure
  • 1.3 The inspection is planned in detail including sequencing, prioritising and considerations are made where appropriate of relevant technical and engineering procedures.
  • 1.4 Resources required to satisfy the plan are identified, obtained and inspected for compliance with the job specifications
  • 1.5 Relevant plans, drawings and texts are selected and interpreted in accordance with the plan
  • 1.6 Co-ordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the work
  • 1.7 Potential hazards are identified and prevention and/or control measures are selected in accordance with the inspection plan and site procedures
  • 1.8 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Carry out generator inspection
  • 2.1 Required isolations are confirmed where appropriate in accordance with site requirements
  • 2.2 Generator is inspected using appropriate manuals, drawings and texts in accordance with the plan
  • 2.3 Generator is inspected in conjunction with others involved in, or affected by, the inspection plan
  • 2.4 Any needs for additional tests/inspections required are defined
  • 2.5 Inspection is carried out and permits relinquished in accordance with the plan
3 Evaluate/analyse inspection results
  • 3.1 Test/inspection results and data are analysed
  • 3.2 Conclusions drawn with reference to potential options
  • 3.3 Specialist assistance is sought when required
4 Prepare remedial action plan
  • 4.1 Action plan is prepared for any required remedial action
  • 4.2 Remedial action is followed up and checked for effectiveness
5 Update documentation
  • 5.1 All relevant records and documentation are updated in accordance with statutory, industry and enterprise requirements
RANGE STATEMENT
10) This relates to the competency standard unit as a whole providing the range of contexts and conditions to which the Performance Criteria apply. It allows for different work environments and situations that will affect performance.
Details of inspection may be clarified by diagnosis of operational information.
Inspection may include windings, end windings and connections, slot wedges, insulation, end bell, excitation systems, automatic voltage regulator and cooling system.
Inspection completion details may include plant and maintenance records, job cards, check sheets and on device labelling updates.
Work site environment may be affected by nearby plant or processes, e.g. heat, noise, dust, oil, water and chemical.
Isolations can refer to electrical/mechanical or other associated processes.
Tests may include visual and sensory, sampling, tensioning and leak testing.
Faults identified may include movement of conductors, leaks in stator cooling systems, movement of connections and build up of foreign matter.
Appropriate personnel for consultation may include supervisor/team leader or equivalent, technical and engineering officers or equivalent, maintenance staff, power plant operations personnel and external specialist personnel.
Generic terms are used throughout this Training Package for vocational standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms are given in Section 2.1 Preliminary Information and Glossaries.
EVIDENCE GUIDE
9) This provides essential advice for assessment of the competency standard unit and must be read in conjunction with the Performance Criteria and the Range Statement of unit and the Training Package Assessment Guidelines.
The Evidence Guide forms an integral part of this competency standard unit and shall be used in conjunction with all components parts of this unit and, performed in accordance with the Assessment Guidelines of this Training Package.

Overview of Assessment
9.1)

Longitude competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry’s preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accord with Industry and regulatory policy.
Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed.
The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Hence, sources of evidence need to be ‘rich’ in nature so as to minimise error in judgment.
Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its ‘richness’. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practiced. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included in the Assessment Guidelines of this Training Package.

Critical aspects of evidence required to demonstrate competency in this unit
9.2)

Before the critical aspects of evidence are considered all pre-requisites shall be met.
Evidence for competence in this unit shall be considered holistically. Each element and associated Performance Criteria shall be demonstrated on at least two occasions in accordance with the “Assessment Guidelines - UEP12”. Evidence shall also comprise:
A representative body of work performance demonstrated within the timeframes typically expected of the discipline, work function and industrial environment. In particular this shall incorporate evidence that shows a candidate is able to:
Implement Occupational Health and Safety workplace procedures and practices including the use of risk control measures as specified in the Performance Criteria and Range Statement
Apply sustainable energy principles and practices as specified in the Performance Criteria and Range Statement
Demonstrate an understanding of the essential knowledge and associated skills as described in 6) of this unit
Demonstrate an appropriate level of employability skills
Conduct work observing the relevant Anti Discrimination legislation, regulations, polices and workplace procedures
Demonstrated performance across a representative range of contexts from the prescribed items below:
Preparation and planning of work
Inspection techniques and procedures
Working in a confined space
Analyse inspection results and make recommendations

Context of and specific resources for assessment
9.3)

This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
OHS policy and work procedures and instructions
Suitable work environment, facilities, equipment and materials to undertake actual work as prescribed by this unit.
Competency Standards should be assessed in the workplace or simulated workplace and under the normal range of workplace conditions.
Assessment of this unit will be supported with documentary evidence, by means of endorsement stating type and application of work.
In addition to the resources listed above in Context of assessment’, evidence should show competency working, in limited spaces, with different types of plant and equipment as well as different structural/construction types and methods and in a variety of environments.

Method of assessment
9.4)

This unit shall be assessed by methods given in 1.3.00 Assessment Guidelines.
Note:
Competent performance with inherent safe working practices is expected in the Industry to which this unit applies. This requires that the specified essential knowledge and associated skills are assessed in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit.

Concurrent assessment and relationship with other units
9.5)

There are no recommended concurrent assessments with this unit, however in some cases efficiencies may be gained in terms of learning and assessment effort being concurrently managed with allied competency standard units where listed.
UEPMNT421B Conduct technical inspection of process plant and equipment.
Replaced By
State Code National Code Title Type
OAH77 UEPMNT417 Inspect electrical generators and diagnose faults Unit of competency