Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Provide solutions to problems in basic industrial control systems
Provide solutions to problems in basic industrial control systems
Unit of competency
National Code
UEENEEI020B
UEENEEI020B
State Code
W8054
W8054
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
10/11/2009
Field of Education
031313 - Electrical Fitting, Electrical Mechanics
Original Release Date
10/11/2009
Nominal Hours
54
Description
1) 1.1) DescriptorThis unit covers solving problems in basic industrial control systems. The unit encompasses safe working practices, interpreting process and circuit diagrams, applying knowledge of industry controls to problem solving techniques, safety and functional testing and completing the necessary documentation.Note.Typical basic industrial control system problems are those encountered in meeting performance requirements and compliance standards, revising control operating parameters and dealing with control malfunctions.
Notes
Elements and Performance Criteria
1 Prepare to provide solutions to basic industrial control system problems
- 1.1 OHS processes and procedures for a given work area are identified, obtained and understood
- 1.2 Established OHS risk control measures and procedures are followed in preparation for the work.
- 1.3 The extent of basic industrial control system problems are determined from performance specifications and situation reports and in consultations with relevant persons.
- 1.4 Activities are planned to meet scheduled timelines in consultation with others involved in the work.
- 1.5 Tools, equipment and testing devices needed for the work are obtained in accordance with established procedures and checked for correct operation and safety.
2 Provide solutions to basic industrial control system problems
- 2.1 OHS risk control measures and procedures for carrying out the work are followed.
- 2.2 Knowledge of basic industrial control system device and circuit operation, characteristics and applications are applied to developing solutions to control problems.
- 2.3 Parameters, specifications and performance requirements in relation to each basic industrial control system problems are obtained in accordance with established procedures.
- 2.4 Approaches to resolving basic industrial control system problems are evaluated to provide most effective solutions.
- 2.5 Methods for dealing with unexpected situations are selected on the basis of safety and specified work outcomes.
- 2.6 Problems are solved efficiently without waste of materials or damage to apparatus and the surrounding environment or services and using sustainable energy practices.
3 Test and document solutions to basic industrial control system problems
- 3.1 OHS risk control measures and procedures for carrying out the work are followed.
- 3.2 Solutions to basic industrial control system problems are tested to determine their effectiveness and modified where necessary.
- 3.3 Adopted solutions are documented including instruction for their implementation that incorporates risk control measure to be followed. (See Note)
- 3.4 Justification for solutions used to solve basic industrial control system problems are documented in accordance with established procedures.
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC636 | UEENEEI120A | Provide solutions to problems in industrial control systems | Unit of competency |