Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop detailed electrical drawings
Develop detailed electrical drawings
Unit of competency
National Code
UEEEL0007
UEEEL0007
State Code
OBX65
OBX65
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
020115 - Computer Graphics
Original Release Date
12/07/2021
Nominal Hours
54
Description
This unit involves the skills and knowledge required to develop detailed electrical drawings and documentation.It includes preparing and developing detailed electrical drawing, and following documentation and workplace procedures.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to develop detailed electrical drawing
- 1.1 Work health and safety (WHS)/occupational health and safety (OHS) procedures for a given work area are identified, obtained and applied
- 1.2 WHS/OHS risk control measures and procedures in preparation for the work are followed
- 1.3 Detailed electrical drawings are determined from the scope of work to be undertaken
- 1.4 Electrical drawing details required for work to be undertaken are obtained from project specifications and in accordance with workplace procedures
- 1.5 Appropriate person/s is consulted to ensure the work is coordinated effectively with others
- 1.6 Software, tools and equipment for work are obtained in accordance with workplace procedures
2 Develop detailed electrical drawing
- 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
- 2.2 Detailed electrical drawings design and layout requirements are determined from project specifications
- 2.3 Technical data of electrical system components are interpreted to determine parameters included in the detailed electrical drawings
- 2.4 Appropriate software tools are used to produce detailed electrical drawings based on workplace procedures
- 2.5 Detailed electrical drawings are checked for accuracy in accordance with workplace procedures and project specifications
- 2.6 Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
3 Complete detailed electrical drawing documentation
- 3.1 Completed detailed electrical drawings are submitted to appropriate person/s to be checked for accuracy in accordance with workplace procedures and project specifications
- 3.2 Alterations, additions or correction instructions are followed and detailed electrical drawings are re-submitted for final approval
- 3.3 Completed detailed electrical drawings are filed securely in accordance with workplace procedures
No information