Unit of competency Outline

Date retreived
22/07/2026 1:33 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Coordinate tram/light rail traffic movement

Coordinate tram/light rail traffic movement

Unit of competency
National Code
TLIL4085A
State Code
WI830
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
24/12/2013
State Implementation and Classification
Approved Date
21/03/2014
Field of Education
039907 - Rail Operations
Original Release Date
21/03/2014
Nominal Hours
55
Description
This unit involves the skills and knowledge required to coordinate tram/light rail traffic movement in accordance with organisational procedures, regulatory requirements and codes of practice. It includes monitoring the status of and implementing the daily timetable; controlling tram/light rail traffic movements; implementing contingency plans for system faults, failures and planned events; and updating traffic movement documentation in accordance with organisational requirements. Licensing or certification requirements are not applicable to this unit.
Notes
Elements and Performance Criteria
1 Monitor status of daily timetable
  • 1.1 Tram/light rail movements and associated activities are analysed to establish current situation
  • 1.2 Out of course tram/light rail movements, special events, planned reconstruction work and associated activities are identified to establish their effect on the status of the daily timetable
  • 1.3 Notices are checked and adjustments are made as required
2 Implement daily timetable
  • 2.1 Tram/light rail movements are coordinated to ensure optimum and consistent running to schedules in accordance with organisational policies and procedures
  • 2.2 Relevant information is communicated to internal and external customers
  • 2.3 Planned and unplanned tram/light rail movements are implemented in accordance with organisational policies and procedures
3 Control tram and light rail traffic movement
  • 3.1 Tram/light rail movements are coordinated with other relevant personnel in accordance with organisational policies and procedures
  • 3.2 Operational tactical situations are monitored to ensure adherence of tram/light rail traffic to daily timetable
  • 3.3 Alarm systems are monitored and responded to as required in accordance with organisational policies and procedures
4 Communicate with track/emergency/ rail safety workers
  • 4.1 Communication with relevant track/emergency/rail safety workers is undertaken to ensure they are informed of tram/light rail movements, in accordance with organisational policies and procedures
  • 4.2 Alternative communication methods are identified and used when regular communication system malfunctions
5 Implement contingency plans
  • 5.1 Contingency plan to suit unplanned track works, disruptions, system failure or fault is identified and actioned in accordance with organisational policies and procedures
  • 5.2 Resources to respond to the contingency are arranged in accordance with relevant organisational policies and procedures
  • 5.3 Required communications are established
  • 5.4 Tram/light rail service is adjusted in accordance with organisational requirements
  • 5.5 Communications with internal and external customers are established and maintained as required
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.
Special events may be:
demonstrations
festivals
parades
sporting events
Associated activities may impact on the movement of tram/light rail traffic and may include:
defective electrical systems
diversion/alternative routing of tram/light rail traffic
track maintenance
Events triggering the need to implement contingency plans may include:
adverse environmental events
breakdowns
collisions
derailments
electrical system faults
fires
hazardous materials spills
injuries and fatalities
passenger actions
track damage
Communication systems may include:
computers
email
faxes
internet
radios
telephones
Rail safety workers may include:
contractors
depot starters
electrical control officers
line officers
network officers
signallers
track workers
tram/light rail drivers
senior drivers
Notices may include:
matters for attention book
special tram/light rail notices
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:
required knowledge and skills
relevant legislation and workplace procedures
other relevant aspects of the range statement.
Assessment must include exercises that demonstrate competent performance of the following in a range of situations:
implementing unplanned tram/light rail movements in accordance with organisational procedures
identifying alternative communication systems for unplanned events
arranging resources to deal with a contingency.
Context of and specific resources for assessment
Performance is demonstrated consistently over time and in a suitable range of contexts.
Resources for assessment include access to:
a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or
an appropriate range of relevant operational situations in the workplace.
In both real and simulated environments, access is required to:
relevant and appropriate materials and equipment, and
applicable documentation including workplace procedures, regulations, codes of practice and operation manuals.
Method of assessment
As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests.
Practical assessment must occur in an appropriate range of situations in the workplace.
Replaced By
State Code National Code Title Type
AVI46 TLIL4085 Coordinate tram/light rail traffic movement Unit of competency
State Code National Code Title Type
J806 TLI42713 Certificate IV in Tram/Light Rail Control Qualification