Unit of competency Outline

Date retreived
22/07/2026 2:13 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Design hybrid renewable power systems

Design hybrid renewable power systems

Unit of competency
National Code
UEERE0028
State Code
OCA10
TGA Status
Deleted
DTWD Status
Deleted
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Original Release Date
12/07/2021
Nominal Hours
72
Description
This unit involves the skills and knowledge required to design a hybrid renewable power system and its installation.It includes determining and developing hybrid power systems design, following design briefs, documenting design calculations and criteria, and obtaining approval for hybrid renewable power system design.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to design hybrid renewable power system
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) processes and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 Scope of the system is determined from design brief
  • 1.3 Safety and other regulatory requirements to which the renewable power system installation must comply are identified and applied
  • 1.4 Design development work is planned to meet scheduled timelines in consultation with relevant person/s involved in the hybrid power system installation or associated work
2 Develop hybrid renewable power system design
  • 2.1 Hybrid renewable power system performance standards and compliance methods are applied to the design
  • 2.2 Alternative hybrid renewable power system designs are considered in accordance with the design brief
  • 2.3 Safety, functionality and budgetary considerations are incorporated in the hybrid renewable power system design
  • 2.4 Hybrid renewable power system design is drafted and checked for compliance with the design brief and regulatory requirements
  • 2.5 Hybrid renewable power system design is documented for submission to relevant person/s for acceptance and approval
  • 2.6 Unplanned situations are dealt with safely and effectively in accordance with workplace procedures
3 Obtain design approval for hybrid renewable power system
  • 3.1 Hybrid renewable power system design is presented for approval and any issues clarified with client representative and/or relevant person/s
  • 3.2 Requests for alterations to the design are negotiated with relevant person/s within the constraints of workplace policies
  • 3.3 Final design is documented and approval obtained from relevant person/s
  • 3.4 Quality of work is monitored in accordance with relevant performance agreement and/or workplace procedures or industry standards
No information
No information
Replaces
State Code National Code Title Type
WC703 UEENEEK133A Design hybrid renewable power systems Unit of competency