Unit of competency Outline
Date retreived
24/07/2026 7:35 AM AWST
24/07/2026 7:35 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Plan resource recovery
Plan resource recovery
Unit of competency
National Code
PRMWM61A
PRMWM61A
State Code
S4415
S4415
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
26/11/2004
Field of Education
039901 - Environmental Engineering
Original Release Date
26/11/2004
Nominal Hours
45
Description
This unit of competency covers the fundamental planning requirements for resource recovery. This competency may be expected to apply to a worker who has significant team-leading responsibilities. This unit would usually be carried out under managerial supervision, within organisational guidelines.
Notes
Elements and Performance Criteria
1 Identify range of materials within the waste stream available for recovery
- 1.1 Undertake audit of the waste stream including identification of source, frequency of disposal, method of transportation, and manner in which loads are delivered for disposal
2 Undertake a feasibility study to assess the financial viability of a resource recovery operation
- 2.1 Determine material recovery, storage, transport and sales processes which comply with relevant legislative and company requirements2.2 Undertake market research to assess demand for recovered material/products and current market values2.3 Liaise with all relevant stakeholders to identify existing or potential recovery facilities2.4 Ascertain the level of commitment from stakeholders to developing resource recovery facilities where required
3 Develop a resource recovery strategy
- 3.1 Establish the goals and targets to divert components of the waste stream based upon audit/assessment and feasibility study outcomes3.2 Ensure all relevant legislative and company requirements are incorporated in the strategy3.3 Consult with stakeholders to identify opportunities and risks for consideration in the strategy
4 Determine operational requirements
- 4.1 Assess site requirements including infrastructure requirements, zoning, environmental aspects and energy efficiency systems4.2 Develop budgets for plant, equipment and materials
- 4.3 Identify service requirements that may include education, customer service, and point of sale activities
- 4.4 Identify human resources required to support strategy4.5 Develop product marketing strategies
5 Determine strategy implementation
- 5.1 Establish the measures and methods to be utilised in monitoring the strategy development and implementation and outcomes
6 Document the resource recovery strategy
- 6.1 Document resource recovery strategy with relevant stakeholder input6.2 Integrate all components of the strategy to meet goals and targets6.3 Include all relevant information and analysis in documentation6.4 Document the strategy in a logical and concise manner6.5 Communicate strategy to relevant stakeholders
Feasibility of options should involve consideration of
analysing data and information to determine targets and goals specific to each stream/material
communicating with government agencies and businesses to determine appropriate strategies and infrastructure availability
cost-benefit analysis
identification of barriers
identification of resources available and required
prioritisation of options.
Identification may include but is not limited to
barriers for the implementation of resource recovery options
conducting waste audits or assessments of all waste/resource recovery streams and types of materials in those streams
infrastructure requirements for resource recovery requirements on site
market research to determine on- or off-site needs for materials
process review
related company requirements
review of client and stakeholders' needs
review of legislative and other relevant requirements.
Implementation may include but is not limited to
contract negotiation
development of resourcing requirements including budgets
educational/training programs
market development
material segregation processes
monitoring and review of options
preparation of procedures and associated documents
programs to monitor contamination levels
promotional strategies.
Requirements can be found in
legislation, policies, publications and verbal or written communications.
Resource recovery may include but is not limited to
re-use or recycling of materials on and off site
composting
energy recovery
material changes
supply chain management.
Site operations should include but are not limited to
business premises
identification of sources of information/data
production processes and methods
purchasing procedures
quality assurance protocols
raw material requirements
waste handling, storage and disposal processes.
Source of waste may include but is not limited to
commercial and industrial processes, construction and demolition sites and municipal waste.
Stakeholders may include but are not limited to
government agencies
processors
product buyers
waste and recycling contractors
waste generator.
Strategy development and implementation may include but is not limited to
determining systems and infrastructure needs
developing marketing plans
education needs analysis and programs
material-specific resource recovery goals and dedicated programs to achieve them.
analysing data and information to determine targets and goals specific to each stream/material
communicating with government agencies and businesses to determine appropriate strategies and infrastructure availability
cost-benefit analysis
identification of barriers
identification of resources available and required
prioritisation of options.
Identification may include but is not limited to
barriers for the implementation of resource recovery options
conducting waste audits or assessments of all waste/resource recovery streams and types of materials in those streams
infrastructure requirements for resource recovery requirements on site
market research to determine on- or off-site needs for materials
process review
related company requirements
review of client and stakeholders' needs
review of legislative and other relevant requirements.
Implementation may include but is not limited to
contract negotiation
development of resourcing requirements including budgets
educational/training programs
market development
material segregation processes
monitoring and review of options
preparation of procedures and associated documents
programs to monitor contamination levels
promotional strategies.
Requirements can be found in
legislation, policies, publications and verbal or written communications.
Resource recovery may include but is not limited to
re-use or recycling of materials on and off site
composting
energy recovery
material changes
supply chain management.
Site operations should include but are not limited to
business premises
identification of sources of information/data
production processes and methods
purchasing procedures
quality assurance protocols
raw material requirements
waste handling, storage and disposal processes.
Source of waste may include but is not limited to
commercial and industrial processes, construction and demolition sites and municipal waste.
Stakeholders may include but are not limited to
government agencies
processors
product buyers
waste and recycling contractors
waste generator.
Strategy development and implementation may include but is not limited to
determining systems and infrastructure needs
developing marketing plans
education needs analysis and programs
material-specific resource recovery goals and dedicated programs to achieve them.
Critical aspects of competency
Ability to scope projects.
Ability to classify waste streams and materials to type and source.
Accurate data analysis in regard to resource recovery potential and setting of goals and targets.
Capacity to validate information.
Ability to identify sources of information and analyse data in those sources.
Ability to develop and compare resource recovery options for clients.
Ability to synthesise technical, legislative, economic, environmental and OHS issues in relation to resource recovery options.
Ability to prepare strategies.
Communicating instructions and information to all stakeholders.
Knowledge needed to achieve the performance criteria
Knowledge and understanding are essential to apply this unit in the workplace, to transfer the skills to other contexts, and to deal with unplanned events. The knowledge requirements for this unit are listed below.
Waste audit techniques.
Waste assessment techniques.
Sampling techniques.
Waste stream/material composition.
Legislative requirements and industry sector standards.
Material recovery opportunities and market availability.
Stakeholder identification.
Marketing principles.
Planning and related approvals processes.
Resource recovery infrastructure needs.
Specific skills needed to achieve the performance criteria
To achieve the performance criteria, some complementary skills are required. These are:
data analysis
research and planning
market development
presentation of information
communication - both written and interpersonal
consultation
computer skills.
Resources required to assess this unit
The following resources should be available:
sample waste audit data
education needs analysis results
information on available resource recovery options
costings of options.
Consistency in performance
The assessment requires that the developed resource recovery options relate to the waste stream/material information provided and that recommendations relate to the feasibility for presented options for resource recovery. Implementation programs should take into account the need to ensure employees are fully aware of requirements and that the infrastructure needed will actually assist in meeting goals/targets without compromising OHS and environmental performance. Options should also be costed in regard to an acceptable payback period. Validation of all information should occur.
It is necessary to assess the unit in context of the waste streams and materials generated at a specific industry site.
Context of assessment
Evidence of competency can be obtained by the presentation of a documented set of recommendations that encompass the establishment of goals/targets for resource recovery based on the data provided and the feasibility for any options.
Recommendations should also address barriers and provide a detailed implementation program to ensure acceptability by a broad range of identified stakeholders. The evidence can be presented in the field by observing the development of a site-specific resource recovery program.
Communicating ideas and information
Collect, interpret and comply with legislative, OHS and procedural requirements applicable to each assignment. (3)
Collecting analysing and organising information
Discuss and verify with colleagues or supervisor own role and responsibilities to ensure compliance with assignment and organisational requirements. (3)
Planning and organising activities
Measure and prioritise work tasks to meet operational schedules in an efficient and effective manner. (2)
Working with others and in teams
Provide support and assistance within team to complete work tasks within designated timelines. (2)
Using mathematical ideas and techniques
Use mathematics to measure and schedule tasks. (2)
Solving problems
Clarify contradictory or ambiguous information or instructions with colleagues or supervisor. (1)
Using technology
Use technology to access, organise and record information. (1)
Ability to scope projects.
Ability to classify waste streams and materials to type and source.
Accurate data analysis in regard to resource recovery potential and setting of goals and targets.
Capacity to validate information.
Ability to identify sources of information and analyse data in those sources.
Ability to develop and compare resource recovery options for clients.
Ability to synthesise technical, legislative, economic, environmental and OHS issues in relation to resource recovery options.
Ability to prepare strategies.
Communicating instructions and information to all stakeholders.
Knowledge needed to achieve the performance criteria
Knowledge and understanding are essential to apply this unit in the workplace, to transfer the skills to other contexts, and to deal with unplanned events. The knowledge requirements for this unit are listed below.
Waste audit techniques.
Waste assessment techniques.
Sampling techniques.
Waste stream/material composition.
Legislative requirements and industry sector standards.
Material recovery opportunities and market availability.
Stakeholder identification.
Marketing principles.
Planning and related approvals processes.
Resource recovery infrastructure needs.
Specific skills needed to achieve the performance criteria
To achieve the performance criteria, some complementary skills are required. These are:
data analysis
research and planning
market development
presentation of information
communication - both written and interpersonal
consultation
computer skills.
Resources required to assess this unit
The following resources should be available:
sample waste audit data
education needs analysis results
information on available resource recovery options
costings of options.
Consistency in performance
The assessment requires that the developed resource recovery options relate to the waste stream/material information provided and that recommendations relate to the feasibility for presented options for resource recovery. Implementation programs should take into account the need to ensure employees are fully aware of requirements and that the infrastructure needed will actually assist in meeting goals/targets without compromising OHS and environmental performance. Options should also be costed in regard to an acceptable payback period. Validation of all information should occur.
It is necessary to assess the unit in context of the waste streams and materials generated at a specific industry site.
Context of assessment
Evidence of competency can be obtained by the presentation of a documented set of recommendations that encompass the establishment of goals/targets for resource recovery based on the data provided and the feasibility for any options.
Recommendations should also address barriers and provide a detailed implementation program to ensure acceptability by a broad range of identified stakeholders. The evidence can be presented in the field by observing the development of a site-specific resource recovery program.
Communicating ideas and information
Collect, interpret and comply with legislative, OHS and procedural requirements applicable to each assignment. (3)
Collecting analysing and organising information
Discuss and verify with colleagues or supervisor own role and responsibilities to ensure compliance with assignment and organisational requirements. (3)
Planning and organising activities
Measure and prioritise work tasks to meet operational schedules in an efficient and effective manner. (2)
Working with others and in teams
Provide support and assistance within team to complete work tasks within designated timelines. (2)
Using mathematical ideas and techniques
Use mathematics to measure and schedule tasks. (2)
Solving problems
Clarify contradictory or ambiguous information or instructions with colleagues or supervisor. (1)
Using technology
Use technology to access, organise and record information. (1)
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WC228 | CPPWMT5061A | Plan resource recovery | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S467 | PRM40504 | Certificate IV in Asset Maintenance (Waste Management) | Qualification |