Unit of competency Outline
Date retreived
22/07/2026 1:30 AM AWST
22/07/2026 1:30 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct Non-Routine Operational Testing
Conduct Non-Routine Operational Testing
Unit of competency
National Code
UEPOPS346A
UEPOPS346A
State Code
S5232
S5232
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
31/05/2011
Field of Education
031311 - Powerline Installation And Maintenance
Original Release Date
31/05/2011
Nominal Hours
40
Description
1)
This unit deals with the skills and knowledge required to conduct testing of generation plant and associated equipment which may be of a non-routine nature.
This unit deals with the skills and knowledge required to conduct testing of generation plant and associated equipment which may be of a non-routine nature.
Notes
Elements and Performance Criteria
1 Prepare for testing
- 1.1 Safety issues are identified and complied with in accordance with enterprise/site and legislative requirements
- 1.2 Needs and outcomes for the tests are defined in accordance with work requirements
- 1.3 Test procedures are determined and monitoring equipment requirements are defined in accordance with the test objectives
- 1.4 Availability and access to plant is determined in accordance with work requirements
- 1.5 Coordination requirements, including requests for isolations where appropriate, are resolved with others involved, affected or required by the testing procedure
- 1.6 Where appropriate, the teams and individuals roles and responsibilities within the team are identified and, where required, assist in the provision of the on-the-job training
2 Conduct non-routine testing
- 2.1 Testing is performed in accordance with relevant sections of enterprise, state or national standards and codes of practise
- 2.2 Required isolations are confirmed where appropriate in accordance with enterprise/site requirements
- 2.3 Testing is performed in accordance with defined procedures application to the test
- 2.4 Plant is observed and corrective action taken when response is not in accordance with plant operating parameters/plant integrity or personnel safety
- 2.5 Testing completed, permits relinquished where appropriate, and plant returned to required operational status
3 Complete the work
- 3.1 Appropriate personnel notified of the completion of testing in accordance with enterprise/site procedures
- 3.2 Plant problems or abnormalities are reported and logged in accordance with enterprise/site procedures
- 3.3 Test results/observations are interpreted and documented in accordance with enterprise/site procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| M1673 | UTPNEG239A | Conduct non-routine operational testing | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WE368 | UEPOPS346B | Conduct non-routine operational testing | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| S508 | UEP50106 | Diploma of ESI Generation (Systems Operations) | Qualification |
| S501 | UEP30106 | Certificate III in ESI Generation (Systems Operations) | Qualification |