Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Fix standard plasterboard ceiling sheets
Fix standard plasterboard ceiling sheets
Unit of competency
National Code
CPCCPB3002A
CPCCPB3002A
State Code
W9442
W9442
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
02/04/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to fix standard plasterboard ceiling sheets to comply with manufacturer and job specifications.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Identify work requirements.
- 2.1. Framing is checked to ensure straightness of cornice line and problems reported.
- 2.2. Instructions to assemble materials are identified and followed.
- 2.3. Processes for fixing ceiling sheets are identified from manufacturer recommendations.
- 2.4. Work sequencing and safety procedures to lift, place and support the sheets are identified and followed.
3. Plan and cut ceiling sheets.
- 3.1. Ceiling dimensions are matched to sheet size.
- 3.2. Cuts are planned to locate joints where the effect of glancing light highlighting jointing is minimised.
- 3.3. Cutting process follows employer-approved procedures, minimising dust exposure to others and using appropriate personal protective equipment.
- 3.4. Cut sheets are relocated to fixing site and stored to minimise damage and facilitate planned fixing location.
4. Fix standard ceiling sheets.
- 4.1. Sheets are fixed using manufacturer's recommended methods and fastening systems, including backblocking and employer-approved manual handling techniques.
- 4.2. Work sequences and fixing processes are undertaken.
5. Check and complete work.
- 5.1. Completed work is checked to ensure stop-up activities will be easily completed and appropriate fastening systems have been used.
6. Clean up.
- 6.1. Work area is cleared and waste board, adhesives waste fasteners and other materials are disposed of, reused or recycled in accordance with legislation, regulations and codes of practice and job specification.
- 6.2. Hazardous material is identified for separate handling.
- 6.3. Non-toxic materials are removed using correct procedures.
- 6.4. Dust suppression procedures are used to minimise health risk to work personnel and others.
- 6.5. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to fixing plasterboard
relevant Australian standards
safe work procedures relating to fixing plasterboard
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
broad knives
brooms
electric screw guns
hand and power drills
hand saws
keyhole saws
measuring tapes and rules
paintbrushes
plasterboard hammers
plasterer's trowels
scaffold planks
T squares
taping knives
trestles.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
beads
cement render
fibre cement sheets
finishing materials
plaster compounds
plasterboard
plasterglass sheets
water resistant plasterboard.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Assemblematerials includes:
adhesives
board
equipment
fasteners.
Processes for fixing and work sequencing include:
facilitate finishing techniques appropriate to system
maximise board use
minimise finishing problems
minimise joints
minimise waste.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to fixing plasterboard
relevant Australian standards
safe work procedures relating to fixing plasterboard
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
concealed services (water, power and gas)
lighting
traffic control
restricted access barriers
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment include:
broad knives
brooms
electric screw guns
hand and power drills
hand saws
keyhole saws
measuring tapes and rules
paintbrushes
plasterboard hammers
plasterer's trowels
scaffold planks
T squares
taping knives
trestles.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
beads
cement render
fibre cement sheets
finishing materials
plaster compounds
plasterboard
plasterglass sheets
water resistant plasterboard.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Assemblematerials includes:
adhesives
board
equipment
fasteners.
Processes for fixing and work sequencing include:
facilitate finishing techniques appropriate to system
maximise board use
minimise finishing problems
minimise joints
minimise waste.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
select and use appropriate plasterboard ceiling materials and work methods
explain the reasons for:
screw fixing of ceiling sheets
using particular types of screws for timber or metal frame and furring channel
using trimmers and noggins
butt joins centred between battens and staggered
drilling or sawing openings as required
using paper tape for all joins
backblocking and stitching of butt joins
follow manufacturers' instructions for installation without constant supervision
identify faults in plasterboard fixing, joining and finishing
execute work within agreed timeframes and standards
interpret delivery documentation and work orders
locate relevant materials
apply knowledge of industry products and specifications to identify:
manufacturers' components and materials
warranty compliance issues
suitable materials for a wide range of applications
common faults and problems that require reporting
follow work instructions, operating procedures and inspection practices to:
prevent damage to goods, equipment or products
select and use appropriate personal protective equipment
work effectively alone or with others and minimise the risk of injury
modify work activities to cater for variations in work site procedures, personnel, contexts and environment
maintain workplace records in relation to materials, plant and equipment use
use safe handling requirements, based on information provided for equipment, products and materials.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
building framework
materials
tools and equipment.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function, for example:
CPCCCM2010A Work safely at heights.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
select and use appropriate plasterboard ceiling materials and work methods
explain the reasons for:
screw fixing of ceiling sheets
using particular types of screws for timber or metal frame and furring channel
using trimmers and noggins
butt joins centred between battens and staggered
drilling or sawing openings as required
using paper tape for all joins
backblocking and stitching of butt joins
follow manufacturers' instructions for installation without constant supervision
identify faults in plasterboard fixing, joining and finishing
execute work within agreed timeframes and standards
interpret delivery documentation and work orders
locate relevant materials
apply knowledge of industry products and specifications to identify:
manufacturers' components and materials
warranty compliance issues
suitable materials for a wide range of applications
common faults and problems that require reporting
follow work instructions, operating procedures and inspection practices to:
prevent damage to goods, equipment or products
select and use appropriate personal protective equipment
work effectively alone or with others and minimise the risk of injury
modify work activities to cater for variations in work site procedures, personnel, contexts and environment
maintain workplace records in relation to materials, plant and equipment use
use safe handling requirements, based on information provided for equipment, products and materials.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
building framework
materials
tools and equipment.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Guidance information for assessment
This unit could be assessed on its own or in combination with other units relevant to the job function, for example:
CPCCCM2010A Work safely at heights.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W7110 | BCGPB3002A | Fix standard plasterboard ceiling sheets | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCN13 | CPCCPB3002 | Fix standard plasterboard ceiling sheets | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| 1599 | 52443WA | Certificate II in Building and Construction (Pathway - Trades) | Accredited course |
| 3724 | 52664WA | Certificate III in Wall and Ceiling Fixing (Housing) | Accredited course |
| 1472 | 52208 | Certificate III in Wall and Ceiling Fixing (Housing) | Accredited course |
| D401 | CPC31211 | Certificate III in Wall and Ceiling Lining | Qualification |
| W588 | CPC31208 | Certificate III in Wall and Ceiling Lining | Qualification |
| 1435 | 52531WA | Certificate II in Wall and Ceiling Lining (Pre-Apprenticeship) | Accredited course |
| 1426 | 52133 | Certificate II in Wall and Ceiling Lining (Pre-Apprenticeship) | Accredited course |