Unit of competency Outline

Date retreived
22/07/2026 9:59 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Produce HVAC/R control system diagrams

Produce HVAC/R control system diagrams

Unit of competency
National Code
UEERA0060
State Code
OBZ60
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
05/10/2020
State Implementation and Classification
Approved Date
12/07/2021
Field of Education
031315 - Refrigeration And Air Conditioning Mechanics
Original Release Date
12/07/2021
Nominal Hours
36
Description
This unit involves the skills and knowledge required to produce heating, ventilation and air conditioning/refrigeration (HVAC/R) control system diagrams.It includes applying safe working practices, interpreting technical data and specifications, applying knowledge of HVAC/R control systems drawing protocols, using appropriate drawing tools and documenting design.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Prepare to produce HVAC/R control system diagrams
  • 1.1 Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2 WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
  • 1.3 Scope of work is determined from project specifications and/or discussions with relevant person/s
  • 1.4 Relevant person/s is consulted to ensure the work is coordinated effectively with others involved on the worksite
  • 1.5 Software tools and equipment required for work are obtained in accordance with workplace procedures
2 Produce HVAC/R control system diagrams
  • 2.1 WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2 Relevant control diagrams and layouts required are determined in accordance with project specifications
  • 2.3 Technical data of control system components is interpreted to determine parameters for inclusion in accordance with project specifications
  • 2.4 Relevant software tools are used to produce diagrams in accordance with project specifications
  • 2.5 Diagrams are checked for accuracy in accordance with project specifications and workplace procedures
  • 2.6 Unplanned events are dealt with in accordance with workplace procedures and safe work practices
3 Complete and report HVAC/R control system diagrams
  • 3.1 Completed control diagrams are submitted to relevant person/s for accuracy in accordance with project specifications and workplace procedures
  • 3.2 Alterations, additions and/or corrective instructions are followed and diagrams are re-submitted for final approval in accordance with project specifications and workplace procedures
  • 3.3 Copies of completed diagrams are filed in accordance with workplace procedures
No information
No information
Replaces
State Code National Code Title Type
S7365 UEENEEJ130A Produce HVAC/R control system diagrams Unit of competency