Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Splice and connect timber members

Splice and connect timber members

Unit of competency
National Code
RIICTB306E
State Code
OCY39
TGA Status
Current
DTWD Status
Approved
Current Release Number
1.00
Current Release Date
25/01/2021
State Implementation and Classification
Approved Date
18/06/2021
Field of Education
030901 - Construction Engineering
Original Release Date
18/06/2021
Nominal Hours
30
Description
This unit describes the skills and knowledge required to splice and connect timber members in civil construction including installing and removing temporary supports, applying durability treatments, and completing cutting and splicing of piles or bottom chords.It applies to those working in operational roles. They generally work under minimal supervision to undertake a broad range of tasks in varied work contexts, using some discretion and judgement in selecting equipment, services or contingency measures.Licensing, legislative and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Users must check requirements with relevant body before applying the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare to spice and connect timber members
  • 1.1 Obtain, interpret, clarify and confirm work instructions
  • 1.2 Access, interpret and apply documentation required to splice and connect timber members and confirm work activity is compliant
  • 1.3 Obtain and interpret emergency procedures, and identify steps required to respond to emergencies
  • 1.4 Select and wear personal protective equipment according to site requirements
  • 1.5 Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
  • 1.6 Identify, address and report environmental issues, potential hazards and risks
  • 1.7 Select plant, tools and equipment required to carry out tasks and check for faults
  • 1.8 Identify, confirm, and locate materials required for work application
2. Install temporary supports
  • 2.1 Locate and level bed logs according to job requirements
  • 2.2 Install temporary header according to job requirements
  • 2.3 Position toms and jacks on bed logs according to job requirements
  • 2.4 Install temporary bracing according to job requirements
  • 2.5 Loosen connectors to piles to allow movement and access
  • 2.6 Jack bridge structure clear of pile according to job requirements
3. Join and seal timber members
  • 3.1 Select and measure timber components according to job requirements
  • 3.2 Position timber members for joining according to job requirements
  • 3.3 Apply durability treatments to members
  • 3.4 Apply preservatives to faced sections
  • 3.5 Fit splicing plate according to job requirements
  • 3.6 Install connectors to members according to job requirements
  • 3.7 Remove temporary supports after members are secured
4. Conduct clean-up activities
  • 4.1 Clear work area and dispose of or recycle materials according to site requirements
  • 4.2 Clean, check, perform maintenance on and store machinery, tools and equipment according to manufacturer specifications and site requirements
No information
No information
Replaces
State Code National Code Title Type
WH170 RIICTB306D Splice and connect timber members Unit of competency
State Code National Code Title Type
BGL0 RII30920 Certificate III in Civil Construction Qualification