Unit of competency Outline

Date retreived
22/07/2026 1:35 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install, operate and maintain hydrometric instruments and equipment

Install, operate and maintain hydrometric instruments and equipment

Unit of competency
National Code
NWP420A
State Code
D4827
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
30/04/2012
State Implementation and Classification
Approved Date
02/06/2011
Field of Education
030907 - Water And Sanitary Engineering
Original Release Date
02/06/2011
Nominal Hours
130
Description
This unit of competency describes the outcomes required to install, operate and maintain hydrometric instruments and equipment in sound order and to organisational standards. The role requires understanding of the capacity, purpose and application of the instruments and equipment and the ability to select, install, test and maintain hydrometric instruments and equipment to provide accurate data for the client.This unit replaces NWP341A Install and maintain hydrometric instruments and equipment
Notes
Elements and Performance Criteria
1Plan the installation of hydrometric instruments and equipment
  • 1.1 Analyse the purpose and suitability of hydrometric instruments and equipment required for the site and its conditions.
  • 1.2 Ensure that the manufacturers' specifications are applied.
  • 1.3 Confirm organisational procedures for installing the instruments and equipment and reflect these in the plan of installation task schedules.
  • 1.4 Prepare relevant equipment, logistical requirements, authorisations and documentation required for the installation.
2Install hydrometric instruments, equipment and systems
  • 2.1 Assemble, prepare and test assignmentinstruments and equipment prior to transportation to the site to ensure that they are fit for purpose.
  • 2.2 Install assignment instruments and equipment in accordance with manufacturers' specifications, organisational standards and safe work practices.
  • 2.3 Conduct installation tests in accordance with standard operating procedures to ensure the correct operation of instruments and equipment.
  • 2.4 Complete records and commissioning of the installation process in accordance with organisational procedures.
3Test and maintain hydrometric instruments, equipment and systems
  • 3.1 Test assignment instruments and equipment in accordance with organisational, industry standards and client requirements.
  • 3.2 Make and test adjustments to comply with the required tolerances.
  • 3.3 Report errors or deviations from the appropriate range or tolerance levels in accordance with organisational and industry standards.
  • 3.4 Maintain test records in accordance with organisational requirements.
  • 3.5 Complete routine maintenance in accordance with organisational requirements and maintenance schedules.
  • 3.6 Store and protect instruments and equipment in accordance with organisational and manufacturers' requirements.
4Operate hydrometric monitoring equipment
  • 4.1 Use monitoring equipment to collect data required by assignment plan and purpose.
  • 4.2 Make calculations and adjustments according to the requirements of the site and equipment.
  • 4.3 Check the accuracy and reliability of readings and confirm or adjust calibrations.
5Report processes and outcomes
  • 5.1 Compile reports and data according to organisational requirements and monitoring plan.
  • 5.2 Identify potential and current problems proactively and take corrective action or report to relevant agents.
  • 5.3 Identify indicators of urgency and high risk for priority response.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Hydrometric instruments and equipment may include:
sensors
transducers
samplers
data loggers
telemetry
power supplies
float wells
weirs and flumes
gauge boards
Documentation may include:
job specifications and work plans
maps and plans
survey data
notice of entry procedures
quarantine procedures
mines regulations
organisational procedures and manuals
instrument and systems manufacturers' manuals
standards relevant to the installation tasks including:
AS 3778 for water measurement installations
World Meteorological Organisation / Bureau of Meteorology guidelines for siting of meteorological sensors and systems
documentation of best practice methodology where standards not applicable or available
Assignment instruments and equipment may include:
personal protective equipment
hand and power tools
portable power supplies
computer equipment
pumping equipment
test equipment
communications equipment
signage
4WD vehicles
surveying equipment:
pegs
staffs
levels
GPS
electronic data management systems
water velocity measurement devices:
mechanical current meters
acoustic-Doppler current meters and profiles
Organisational standards and safe work practices may include reference to:
by-laws and organisational policies
standard operating procedures
environment protection standards and requirements
occupational health and safety standards and requirements, including use of personal protective equipment
safe handling of hazardous substances
appropriate use of road and worksite signage
survey of sections
procedures for discharge measurement in open channels using mechanical current meters:
waded gaugings
flood gaugings by cableways
travellers or boats
procedures for discharge measurement in open channels using:
acoustic-Doppler current meters or profilers waded gaugings
flood gaugings by staffed cableway
unstaffed traveller waybridge or boat
Routine maintenance may include:
using appropriate cleaning agents and materials to remove surface dirt and contaminants
applying lubricants in accordance with work instructions and manufacturers' specifications
performing annual or other routine and scheduled inspections of physical surroundings of the monitoring installation to identify external impacts (adverse or otherwise) on data quality and monitoring system performance
performing preventative maintenance management systems
maintaining instrument/system management databases and record systems to assist with planning outages or alternative monitoring systems
replacing components in accordance with work instructions and manufacturers' specifications
conducting minor repairs
conducting calibrations
conducting appropriate vegetation management in gauging sections, around meteorological monitoring sites to maintain constant environmental factors affecting the monitoring site
Store and protect instruments by a range of processes including:
stowing instruments and equipment securely and in appropriate containers for storage and transport
protecting instruments and equipment, as appropriate, from extremes of:
heat
moisture
electromagnetic radiation
shock
vibration
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
The candidate should demonstrate, in accordance with standard organisational and industry procedures, the ability to install, operate and maintain hydrometric instruments and equipment in sound order and to organisational standards including:
interpreting and applying complex technical information and applications related to the installation and maintenance of a range of hydrometric instruments and equipment
conducting accurate and reliable tests of a range of hydrometric instruments and equipment and make adjustments to maintain accuracy
installing and maintaining a range of hydrometric instruments and equipment in a range of sites and conditions and under conditions of extreme weather and high risk
analysing risks in a range of locations and conditions and working safely in routine and extreme conditions
identifying, reporting and solving potential and current problems, and taking immediate action to address high risk conditions
Context of and specific resources for assessment
Access to the workplace and resources including:
documentation that should normally be available in a water industry organisation
workplace specific equipment and technology
supervision and experienced team members to provide observations, feedback and third party reports
enterprise operating procedures and work allocation
relevant codes, standards, and government regulations
Where applicable, physical resources should include equipment modified for people with disabilities.
Access must be provided to appropriate learning and/or assessment support when required.
Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed.
Validity and sufficiency of evidence require that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice
a decision of competence should only be made when the assessor has complete confidence in the person's competence over time and in various contexts
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence
where assessment is for the purpose of recognition (RCC/RPL), the evidence provided will need to be authenticated and show that it represents competency demonstrated over a period of time
assessment can be through simulated project-based activity and must include evidence relating to each of the elements in this unit
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed.
Replaced By
State Code National Code Title Type
AVZ17 NWPHYD013 Operate, maintain and decommission monitoring sites Unit of competency
State Code National Code Title Type
D246 NWP40107 Certificate IV in Water Operations Qualification