Unit of competency Outline
Date retreived
22/07/2026 11:38 AM AWST
22/07/2026 11:38 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Overhaul steering system components
Overhaul steering system components
Unit of competency
National Code
AURT415145A
AURT415145A
State Code
W5101
W5101
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
12/06/2006
Field of Education
030503 - Vehicle Mechanics
Original Release Date
12/06/2006
Nominal Hours
36
Description
This unit covers the competence required to carry out an overhaul of steering system components, including mechanical and power assisted components.
Notes
Elements and Performance Criteria
1. Prepare to undertake overhaul of steering system components
- 1.1. Nature and scope of the work requirements are identified and confirmed
- 1.2. OH&S requirements, including individual State/Territory regulatory requirements and personal protection needs are observed throughout the work
- 1.3. Procedures and information such as workshop manuals, specifications and tooling, are sourced
- 1.4. Method options are analysed and those most appropriate to the circumstances are selected and prepared
- 1.5. Technical and/or calibration requirements for overhaul are sourced and support equipment is identified and prepared
2. Test steering system and analyse results
- 2.1. Methods for the conduct of the system tests are implemented in accordance with workplace procedures and manufacturer/component supplier specifications
- 2.2. Results are compared with manufacturer/component supplier specifications to indicate compliance or non-compliance
- 2.3. Results are documented with evidence and supporting information and recommendation(s) made
- 2.4. Report is processed in accordance with workplace procedures
3. Overhaul steering systems and/or associated components
- 3.1. Information is accessed and interpreted from manufacturer/component supplier specifications
- 3.2. Overhaul and/or replacements to faulty steering systems are carried out in accordance with manufacturer/ component supplier specifications for methods, equipment and tolerances
- 3.3. Steering systems overhaul is completed without causing damage to any component or system
- 3.4. All steering systems overhaul, removal/replacement activities are carried out according to industry regulations/guidelines, OH&S legislation, legislation and enterprise procedures/policies
4. Prepare components for use or storage
- 4.1. Overhaul schedule documentation is completed
- 4.2. Final inspection is made to ensure work is to workplace expectations
- 4.3. Components are presented for use or stored to workplace expectations
- 4.4. Job card is processed in accordance with workplace procedures
Steering system components may be in light vehicles, heavy vehicles, including articulated, tracked and wheeled type vehicles and include mechanical steering boxes, power-assisted steering boxes and full power steering assemblies
Steering components may include pumps, orbital valves, valves and actuators
Overhaul methods and sequences are to include the complete dismantling of component parts, measuring and evaluation of wear, the replacement, repair, rebuilding or reconditioning of parts comparable to original parts, the assembly of parts, performance of functional testing and the completion of records
Work requires individuals to demonstrate some judgement and problem-solving skills in managing own work activities and contributing to a productive team environment
Work is carried out in accordance with award provisions
OH&S requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances
Personal protective equipment is to include that prescribed under legislation/regulations/codes of practice and workplace policies and practices
Safe operating procedures are to include, but are not limited to the conduct of operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and site visitors
Emergency procedures related to this unit are to include, but are not limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and site evacuation
Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management
Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures
Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice
Tooling and equipment may include hand tooling, power tooling, specialist tooling for dismantling/assembling/ adjustment, testing equipment, hydraulic pressure testers, multimeters, test lights and precision measurement tooling
Materials may include steering components, spare parts, lubricants and cleaning materials
Communications are to include, but are not limited to verbal and visual instructions and fault reporting and may include site specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers
Information sources may include, but are not limited to verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches
Safe work procedures related to the overhaul of steering system components
Regulatory/legislative requirements pertaining to the automotive industry, including Australian Design Rules
Engineer's design specifications and instructions
Organisation work specifications and requirements
Instructions issued by authorised enterprise or external persons
Australian Standards
Steering components may include pumps, orbital valves, valves and actuators
Overhaul methods and sequences are to include the complete dismantling of component parts, measuring and evaluation of wear, the replacement, repair, rebuilding or reconditioning of parts comparable to original parts, the assembly of parts, performance of functional testing and the completion of records
Work requires individuals to demonstrate some judgement and problem-solving skills in managing own work activities and contributing to a productive team environment
Work is carried out in accordance with award provisions
OH&S requirements are to be in accordance with legislation/regulations/codes of practice and enterprise safety policies and procedures. This may include protective clothing and equipment, use of tooling and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, enterprise first aid, hazard control and hazardous materials and substances
Personal protective equipment is to include that prescribed under legislation/regulations/codes of practice and workplace policies and practices
Safe operating procedures are to include, but are not limited to the conduct of operational risk assessment and treatments associated with vehicular movement, toxic substances, electrical safety, machinery movement and operation, manual and mechanical lifting and shifting, working in proximity to others and site visitors
Emergency procedures related to this unit are to include, but are not limited to emergency shutdown and stopping of equipment, extinguishing fires, enterprise first aid requirements and site evacuation
Environmental requirements are to include but are not limited to waste management, noise, dust and clean-up management
Quality requirements are to include, but are not limited to regulations, including Australian Standards, internal company quality policy and standards and enterprise operations and procedures
Statutory/regulatory authorities may include Federal, State/Territory and local authorities administering acts, regulations and codes of practice
Tooling and equipment may include hand tooling, power tooling, specialist tooling for dismantling/assembling/ adjustment, testing equipment, hydraulic pressure testers, multimeters, test lights and precision measurement tooling
Materials may include steering components, spare parts, lubricants and cleaning materials
Communications are to include, but are not limited to verbal and visual instructions and fault reporting and may include site specific instructions, written instructions, plans or instructions related to job/task, telephones and pagers
Information sources may include, but are not limited to verbal or written and graphical instructions, signage, work schedules/plans/specifications, work bulletins, memos, material safety data sheets, diagrams or sketches
Safe work procedures related to the overhaul of steering system components
Regulatory/legislative requirements pertaining to the automotive industry, including Australian Design Rules
Engineer's design specifications and instructions
Organisation work specifications and requirements
Instructions issued by authorised enterprise or external persons
Australian Standards
Critical aspects for assessment and evidence required to demonstrate competency in this unit
It is essential that competence in this unit signifies ability to transfer competence to changing circumstances and to respond to unusual circumstances in the critical aspects of:
observing safety procedures and requirements
communicating effectively with others involved in or affected by the work
selecting methods and techniques appropriate to the circumstances
completing preparatory activity in a systematic manner
interpreting test results
conducting the overhaul in accordance with workplace and manufacturer/component supplier requirements
completing overhaul of a range of significant steering system components within workplace timeframes
Relationship to other units
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role
Underpinning knowledge
A working knowledge of:
OH&S regulations/requirements, equipment, material and personal safety requirements
the principles of gearing as applied to the steering systems
types and layout of service/repair manuals (hard copy and electronic)
steering systems overhaul procedures
component repair and adjustment procedures
manual handling procedures
enterprise quality procedures
work organisation and planning processes
Context of, and specific resources for assessment
Application of competence is to be assessed in the workplace or simulated worksite
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints
Assessment is to comply with regulatory requirements, including Australian Standards
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
It is preferable assessment reflects a process rather than an event and occurs over a period of time to cover the varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other appropriate persons subject to agreed authentication arrangements
Specific resource requirements for this unit
The following resources should be made available:
workplace location or simulated workplace
materials relevant to the overhaul of steering system components
equipment, hand and power tooling appropriate to the overhaul of steering system components
activities covering the mandatory task requirements
specifications and work instructions
It is essential that competence in this unit signifies ability to transfer competence to changing circumstances and to respond to unusual circumstances in the critical aspects of:
observing safety procedures and requirements
communicating effectively with others involved in or affected by the work
selecting methods and techniques appropriate to the circumstances
completing preparatory activity in a systematic manner
interpreting test results
conducting the overhaul in accordance with workplace and manufacturer/component supplier requirements
completing overhaul of a range of significant steering system components within workplace timeframes
Relationship to other units
Competence in this unit may be assessed in conjunction with other functional units which together form part of the holistic work role
Underpinning knowledge
A working knowledge of:
OH&S regulations/requirements, equipment, material and personal safety requirements
the principles of gearing as applied to the steering systems
types and layout of service/repair manuals (hard copy and electronic)
steering systems overhaul procedures
component repair and adjustment procedures
manual handling procedures
enterprise quality procedures
work organisation and planning processes
Context of, and specific resources for assessment
Application of competence is to be assessed in the workplace or simulated worksite
Assessment is to occur using standard and authorised work practices, safety requirements and environmental constraints
Assessment is to comply with regulatory requirements, including Australian Standards
Method of assessment
Assessment must satisfy the endorsed assessment guidelines of the automotive industry's RS&R Training Package
Assessment methods must confirm consistency and accuracy of performance together with application of underpinning knowledge
Assessment must be by direct observation of tasks, with questioning on underpinning knowledge and it must also reinforce the integration of key competencies
Assessment may be applied under project related conditions (real or simulated) and require evidence of process
Assessment must confirm a reasonable inference that competence is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances
It is preferable assessment reflects a process rather than an event and occurs over a period of time to cover the varying quality circumstances. Evidence of performance may be provided by customers, team leaders/members or other appropriate persons subject to agreed authentication arrangements
Specific resource requirements for this unit
The following resources should be made available:
workplace location or simulated workplace
materials relevant to the overhaul of steering system components
equipment, hand and power tooling appropriate to the overhaul of steering system components
activities covering the mandatory task requirements
specifications and work instructions
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF407 | AURTTD4005 | Overhaul steering system components | Unit of competency |