Unit of competency Outline

Date retreived
22/07/2026 9:53 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Plan production

Plan production

Unit of competency
National Code
MSFFT5006
State Code
WI467
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
10/12/2013
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
030101 - Manufacturing Engineering
Original Release Date
20/06/2014
Nominal Hours
54
Description
This unit of competency covers planning and documenting the overall requirements of production in a furnishing enterprise.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Establish production requirements
  • 1.1 Data from the sales/market forecast is interpreted for inclusion in the production plan
  • 1.2 Specifications and supporting data are analysed
  • 1.3 Projected requirements regarding product quantity, quality, raw materials and performance characteristics are established
  • 1.4 Production capacity of machines and personnel is determined and/or confirmed
  • 1.5 Resources required, including raw materials supply requirements for the production line, are identified
2 Prepare production plan
  • 2.1 Information and details to include in the production plan are assembled and confirmed, where necessary
  • 2.2 Inefficiencies and constraints are considered and potential improvements or variations to the plan are identified, where applicable
  • 2.3 Production plan is prepared in accordance with enterprise procedures
3 Monitor and coordinate variations to plan
  • 3.1 Production plan is monitored to ensure efficient and effective production performance and any variations required are identified
  • 3.2 Plans are modified, where necessary, to reflect out of stock and overstock situations, machine and human resource requirements or variations
  • 3.3 Implementation of plan variations is coordinated to ensure compliance with instructions/specifications
4 Maintain records
  • 4.1 Production planning records are maintained and reports prepared, where necessary, in accordance with enterprise procedures
No information
No information
Replaced By
State Code National Code Title Type
ODZ66 MSFFDM5011 Plan production Unit of competency
State Code National Code Title Type
J731 MSF50313 Diploma of Furniture Design and Technology Qualification