Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install and finish plasterboard and fibre cement sheeting to curved walls and ceilings

Install and finish plasterboard and fibre cement sheeting to curved walls and ceilings

Unit of competency
National Code
CPCCWC3001A
State Code
W9604
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
02/04/2014
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to fix and finish plasterboard and fibre cement sheeting to steel and timber framed curved walls and curved ceilings.It includes planning and preparation for the work, preparation of the work area for the installation process, measuring and cutting the material, fixing the material, jointing and finishing, and completion of post work clean-up activities.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans and specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied.
2. Prepare work area for installation processes.
  • 2.1. Work area and substrate are prepared for application of sheeting.
  • 2.2. Timber or steel wall and ceiling framing are checked for consistency of curve and any faults are rectified or reported.
  • 2.3. Equipment and materials are checked against work order or manufacturers' specification and positioned in preparation for the work.
  • 2.4. Thermal and acoustic batt insulation for walls and ceilings are selected to manufacturer specifications (RW rating).
3. Install batt system insulation.
  • 3.1. Insulation batts are installed firmly between framing member and against lining material in accordance with manufacturer specifications.
  • 3.2. Batts are abutted with closed joints and end of run completed with batt cut to size and fitted.
  • 3.3. Insulation batts are installed firmly in the wall framing, ensuring clearance of framing to fix plaster sheeting.
  • 3.4. Batts are installed to ceiling framing to a tight fit, ensuring full coverage between joists.
4. Fix plasterboard and fibre cement products to walls and ceilings.
  • 4.1. Materials are pre-conditioned for the application in accordance with manufacturer specifications.
  • 4.2. Materials are measured and marked to ensure compliance with work requirements and minimal wastage.
  • 4.3. Wall and ceiling sheets are cut to fit specified locations with clearance to manufacturer specifications.
  • 4.4. Wall and ceiling sheets are fixed to specified locations with mechanical fastenings or combined adhesive and fasteners, to manufacturer specifications and relevant standards.
  • 4.5. All work is carried out to manufacturer specifications and relevant Australian standards.
5. Joint and finish materials.
  • 5.1. Compounds for backblocking and jointing are prepared to manufacturer specifications.
  • 5.2. Backblocks are applied to specification.
  • 5.3. Additional design details and features are identified.
  • 5.4. Beading is installed to design requirements.
  • 5.5. Jointing and finishing of plasterboard and fibre cement sheeting is completed in accordance with manufacturer specifications.
6. Clean up.
  • 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 6.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining the installation and finishing of plasterboard and fibre cement sheeting
relevant Australian standards
safe work procedures relating to the installation and finishing of plasterboard and fibre cement sheeting
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Planning and preparation include:
assessment of conditions and hazards
determination of work requirements and safety plans and policies
equipment defect identification
work site inspection.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
hazard control
hazardous materials and substances
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
lighting
manual handling
noise, dust and ventilation
power equipment
power sources and cables
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
broad knives
cement sheet cutters (electric and hand)
electric screw guns
hand sanding floats
hand saws
internal angle taping tools
keyhole saws (electric and hand)
measuring tapes and rules
mixers (electric and hand)
paintbrushes
plasterboard hammers
plasterer's trowels
taping knives
T-squares
may include:
electric sanding floats
mechanical finishing tools
scaffold planks
trestles.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Materials include:
adhesives
arch beads
base
casing beads
corner beads
fibre cement sheets
finishing materials
insulation batts
perforated paper tape
plasterboard
shadowline beads.
Material application is to be in accordance with:
manufacturer specifications for fibre cement sheeting
relevant Australian standard (for plasterboard).
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Substrates include:
battened masonry surfaces
steel framing
steel furring channels
timber framing
timber or steel battens.
Curved ceilings are vaulted ceilings which may be:
cambered
elliptical
pitched
undulating.
Curved surfaces include:
bulkheads.
Finishing is to achieve:
a smooth, flat, scratch and blemish free surface.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures including quality requirements
safely and effectively operate and use tools, plant and equipment
communicate and work effectively and safely with others
install and finish plasterboard or fibre cement sheeting to a curved substrate, including:
a minimum of two sheets
either mechanical or adhesive fixing systems.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
workplace location or simulated workplace
materials relevant to installation and finishing operations
hand and power tools and equipment appropriate to installation and finishing operations
realistic activities covering the mandatory task requirements
specifications and work instructions.
Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.