Unit of competency Outline
Date retreived
23/07/2026 6:59 AM AWST
23/07/2026 6:59 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Licence to operate a bridge and gantry crane
Licence to operate a bridge and gantry crane
Unit of competency
National Code
TLILIC0016
TLILIC0016
State Code
ODQ12
ODQ12
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
14/03/2022
Field of Education
030717 - Plant And Machine Operations
Original Release Date
14/03/2022
Nominal Hours
70
Description
This unit specifies the skills and knowledge required to operate bridge cranes and gantry cranes safely. Competence in this unit, does not in itself result in a High-Risk Work Licence (HRWL) to operate this plant.Bridge crane means a crane that:consists of a bridge beam or beams, that are mounted to end carriages at each end, andcan travel along elevated runways, andhas one or more hoisting mechanisms arranged to traverse across the bridge.Gantry crane means a crane that:consists of a bridge beam or beams supported at one or both ends by legs mounted to end carriages, andcan travel on supporting surfaces or deck levels, whether fixed or not, andhas a crab with one or more hoisting units arranged to travel across the bridgeThis unit applies to the activities of a person operating a bridge crane or gantry crane that is: controlled from a permanent cabin or control station on the crane, orremotely controlled and having more than three powered operations.A person performing this work is required to hold a bridge and gantry crane HRWL.This unit requires a person operating a bridge crane or gantry crane to:plan for the work/taskprepare for the work/taskperform work/task pack up.Licensing/Regulatory InformationLegislative and regulatory requirements are applicable to this unit of competency. This unit is based on the licensing requirements of Part 4.5 of the Model Work Health and Safety (WHS) Regulations and meets Commonwealth, state and territory HRWL requirements. The National Assessment Instrument (NAI) is the mandated assessment for the HRWL to operate the relevant licencing class as detailed in this unit.
Notes
Elements and Performance Criteria
1 Plan work/task
- 1.1 Task requirements are identified from work orders or equivalent, a lift plan is confirmed with associated personnel and a site inspection conducted in accordance with workplace procedures
- 1.2 Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures
- 1.3 Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures
- 1.4 Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures
- 1.5 Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures
- 1.6 Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
- 1.7 Appropriate communication procedures are identified and tested with associated personnel in accordance workplace procedures
- 1.8 All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures
- 1.9 Information required to ensure that lifting equipment and gear inspection, use, maintenance and storage complies with manufacturer requirements is obtained and interpreted
2 Prepare for work/task
- 2.1 Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
- 2.2 Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
- 2.3 Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures
- 2.4 Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications
- 2.5 Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan and in accordance with relevant manufacturer specifications, including load chart/s and safe work procedures
- 2.6 Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures
- 2.7 All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures
- 2.8 Crane logbook is inspected and is correct for the crane and type, and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
- 2.9 Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures
- 2.10 Weight of load is identified, calculated or estimated
- 2.11 Derated WLL of lifting equipment resulting from selected slinging techniques is calculated
- 2.12 Suitable lifting points and slinging techniques are identified
- 2.13 Lifting equipment and gear are prepared for safe use
- 2.14 Load destination is confirmed for stability ensuring it is able to bear the load and is prepared for safe access and landing
3 Perform work/task
- 3.1 Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan
- 3.2 Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel
- 3.3 Lifting equipment and gear are connected to load and used safely in accordance with the lift plan and safe work procedures
- 3.4 Test lift is carried out in accordance with safe work procedures
- 3.5 Loads are transferred using relevant bridge or gantry crane movements and tag lines, as required, in accordance with lift plan and safe work procedures
- 3.6 Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures
- 3.7 All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures
- 3.8 Load is lowered and landed safely in accordance with lift plan and safe work procedures
- 3.9 Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
- 3.10 Lifting equipment and gear are inspected for defects, and defective items are isolated, tagged and reported
4 Pack up
- 4.1 Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures
- 4.2 Bridge or gantry crane lifting gear and associated equipment are stowed and secured in accordance with safe work procedures
- 4.3 Relevant motion locks and brakes are applied, as required, in accordance with manufacturer specifications and safe work procedures
- 4.4 Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
- 4.5 Post-operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| OAE35 | TLILIC0006 | Licence to operate a bridge and gantry crane | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| BEK2 | MEM30119 | Certificate III in Engineering - Production Systems | Qualification |
| BEL0 | MEM20219 | Certificate II in Engineering - Production Technology | Qualification |
| BHM1 | PPM30121 | Certificate III in Pulp and Paper Operations | Qualification |
| BHM0 | PPM20121 | Certificate II in Pulp and Paper Operations | Qualification |
| BFE0 | TLI30219 | Certificate III in Stevedoring | Qualification |