Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Develop plans and methodology for fire systems design projects
Develop plans and methodology for fire systems design projects
Unit of competency
National Code
CPCSFS5003A
CPCSFS5003A
State Code
WA409
WA409
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
27/04/2011
Field of Education
039905 - Fire Technology
Original Release Date
27/04/2011
Nominal Hours
35
Description
This unit of competency specifies the outcomes required to ensure a quality result for the detailed design of fire systems through meticulous work organisation, planning and methodology.Licensing, legislative, regulatory or certification requirements may apply to this unit and so the varying state or territory requirements should be confirmed with the relevant body.
Notes
Elements and Performance Criteria
1. Establish relevant project management details.
- 1.1. Project management roles, responsibilities and lines of communication for fire systems design projects are identified and agreed with project team members in line with project timelines.
- 1.2. Relevant project scheduling and sequencing information is identified and confirmed.
- 1.3. Project file-sharing and communication systems and tools are identified and any necessary familiarisation activities are undertaken to ensure efficient and effective operation.
2. Establish procedures for initiating fire systems design projects.
- 2.1. Project and file-naming systems are established according to workplace and project requirements.
- 2.2. Efficient and effective document filing and storage systems are established according to workplace and project requirements.
- 2.3. Systems for efficient tracking and filing of project communications are established according to workplace and project requirements.
- 2.4. A system is established for ensuring that relevant project documentation is requested, received, named and filed according to workplace procedures.
3. Develop a plan for setting up fire systems design projects.
- 3.1. Procedures for setting up correct CAD backgrounds are established according to workplace and project requirements.
- 3.2. Systematic processes for identifying and importing the correct layer drawings into CAD are established according to workplace and project requirements.
- 3.3. Systematic processes for naming, notating and filing drawings are established according to workplace and project requirements.
4. Develop a plan and methodology for designing fire systems.
- 4.1. Steps and timeframes in the design process for fire systems are established according to workplace and project requirements.
- 4.2. Workplace quality assurance checks to ensure accuracy and validity of design are determined and procedures are established to ensure that these are conducted.
- 4.3. Stages where regulatory or other approval is required for the design are determined and procedures are established to ensure that these are obtained.
5. Develop a plan and methodology for finalising fire systems design projects.
- 5.1. Steps and timeframes in the fabrication support process are established according to workplace and project requirements.
- 5.2. Steps and timeframes in the installation support process are established according to workplace and project requirements.
- 5.3. Final drawing and documentation requirements are established according to workplace and project requirements.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Project management roles may include:
client
lead contractor or builder
fire engineering consultant
architect
mechanical engineer or contractor
structural engineer or contractor
electrical engineer or contractor
hydraulic engineer or contractor.
Fire systems may include:
water-based systems, including:
wet pipe sprinkler systems
deluge and drencher systems
dry pipe sprinkler systems
pre-action sprinkler systems
early suppression fast response (ESFR)
hydrants, hose reels and monitors
detection and warning systems, including:
emergency warning and intercommunications systems (EWIS)
fire detection and alarm systems
smoke control systems
emergency lighting systems.
Project documentation may include:
drawings, including:
architectural
structural
mechanical
hydraulic
electrical
layout
section
detail
external references
project plan
project schedule
design brief
design specifications.
Regulatory or other approval may include sign-off by:
building surveyor
fire brigade
fire engineer.
Final drawing and documentation requirements may include:
'as installed' drawings
block plans
tactical fire plans
commissioning benchmarks
operations and maintenance manuals.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Project management roles may include:
client
lead contractor or builder
fire engineering consultant
architect
mechanical engineer or contractor
structural engineer or contractor
electrical engineer or contractor
hydraulic engineer or contractor.
Fire systems may include:
water-based systems, including:
wet pipe sprinkler systems
deluge and drencher systems
dry pipe sprinkler systems
pre-action sprinkler systems
early suppression fast response (ESFR)
hydrants, hose reels and monitors
detection and warning systems, including:
emergency warning and intercommunications systems (EWIS)
fire detection and alarm systems
smoke control systems
emergency lighting systems.
Project documentation may include:
drawings, including:
architectural
structural
mechanical
hydraulic
electrical
layout
section
detail
external references
project plan
project schedule
design brief
design specifications.
Regulatory or other approval may include sign-off by:
building surveyor
fire brigade
fire engineer.
Final drawing and documentation requirements may include:
'as installed' drawings
block plans
tactical fire plans
commissioning benchmarks
operations and maintenance manuals.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that the simulated or project-based assessment fully replicates workplace conditions, materials, activities, responsibilities and procedures.
This unit could be assessed as an activity involving the development of a project plan and methodology for several different types of fire systems design projects. This should include the establishment of team member responsibilities, administrative and communications procedures, document management, scheduling, timelines and arrangements for project finalisation activities.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified within this unit.
In particular the person should demonstrate:
an understanding of the roles of project team members
appropriate consultation and negotiation with project team members, including lead contractor, architect and other services' designers and installation contractors
an understanding of project management processes and the ability to use project management tools effectively for scheduling, communications and file sharing
the ability to plan, organise and conduct fire systems design activities, including installation support and finalisation in line with project timelines, and compliance and quality requirements for a range of fire systems design projects, including:
low-rise buildings
medium-rise buildings
high-rise buildings (over 25 metres)
buildings over 45 metres in height.
Context of and specific resources for assessment
Assessment of essential underpinning knowledge may be conducted in an off-site context. It is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
project documentation, including plans, schedules, design briefs and specifications
copies of codes, standards, legislation and regulatory requirements
access to information and communications technology - hardware and software.
Method of assessment
Assessment must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Guidance information for assessment
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that the simulated or project-based assessment fully replicates workplace conditions, materials, activities, responsibilities and procedures.
This unit could be assessed as an activity involving the development of a project plan and methodology for several different types of fire systems design projects. This should include the establishment of team member responsibilities, administrative and communications procedures, document management, scheduling, timelines and arrangements for project finalisation activities.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the required skills and knowledge specified within this unit.
In particular the person should demonstrate:
an understanding of the roles of project team members
appropriate consultation and negotiation with project team members, including lead contractor, architect and other services' designers and installation contractors
an understanding of project management processes and the ability to use project management tools effectively for scheduling, communications and file sharing
the ability to plan, organise and conduct fire systems design activities, including installation support and finalisation in line with project timelines, and compliance and quality requirements for a range of fire systems design projects, including:
low-rise buildings
medium-rise buildings
high-rise buildings (over 25 metres)
buildings over 45 metres in height.
Context of and specific resources for assessment
Assessment of essential underpinning knowledge may be conducted in an off-site context. It is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
project documentation, including plans, schedules, design briefs and specifications
copies of codes, standards, legislation and regulatory requirements
access to information and communications technology - hardware and software.
Method of assessment
Assessment must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Guidance information for assessment
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCM45 | CPCSFS5003 | Develop plans and methodology for fire systems design projects | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W713 | CPC50509 | Diploma of Fire Systems Design | Qualification |