Unit of competency Outline
Date retreived
22/07/2026 11:56 PM AWST
22/07/2026 11:56 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Apply the principles for the installation of underground service using open excavation
Apply the principles for the installation of underground service using open excavation
Unit of competency
National Code
RIICPL401D
RIICPL401D
State Code
WH107
WH107
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
30/05/2014
Field of Education
030901 - Construction Engineering
Original Release Date
30/05/2014
Nominal Hours
60
Description
This unit describes a participant’s skills and knowledge required to apply the principles for the installation of underground service using open excavation in Civil construction. This unit is appropriate for those working in supervisory or technical specialist roles. No licensing or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Plan and prepare for underground service installation
- 1.1 Access, interpret and apply underground service documentation and ensure the work activity is compliant
- 1.2 Review the installation and identify required tasks
- 1.3 Access, interpret and clarify the specific task information and requirements
- 1.4 Ensure a job plan is available which makes best use of the available resources and meets task requirements
2. Ensure appropriate initiation of tasks is carried out
- 2.1 Confirm that the necessary resources are available for the safe, effective and efficient conduct of the tasks
- 2.2 Ensure clear and timely instructions are communicated to team members and others involved
- 2.3 Set out tasks as required for the job plan
3. Oversee the execution of tasks
- 3.1 Monitor the installation against required outcomes and identify performance gaps
- 3.2 Initiate adjustments to work practice/job plan and ensure achievement of required outcomes
- 3.3 Ensure plant equipment and tools maintenance requirements are carried out and recorded in writing
4. Report on the execution of tasks
- 4.1 Complete and submit written reports
- 4.2 Recommend changes to improve the safety, efficiency and effectiveness of the execution of tasks
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB537 | RIICPL401A | Apply the principles for the installation of underground service using open excavation | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX33 | RIICPL401E | Supervise the installation of underground services using open excavation | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| J637 | RII40813 | Certificate IV in Civil Construction Design | Qualification |
| AZF5 | RII40815 | Certificate IV in Civil Construction Design | Qualification |
| AZE3 | RII50515 | Diploma of Civil Construction Design | Qualification |
| J666 | RII50513 | Diploma of Civil Construction Design | Qualification |
| J663 | RII40613 | Certificate IV in Civil Construction Operations | Qualification |
| AZA5 | RII40615 | Certificate IV in Civil Construction Operations | Qualification |
| AZC9 | RII40715 | Certificate IV in Civil Construction Supervision | Qualification |
| J659 | RII40713 | Certificate IV in Civil Construction Supervision | Qualification |